Key Takeaways: CMMS implementations fail when they skip the foundation work, before a single work order is configured, 10 critical decisions and data preparation steps must be completed. Fabrico's implementation team has run hundreds of these. This checklist is what actually works.
CMMS implementation success is decided before configuration begins, not during it.
The 10 pre-configuration steps that determine outcome:
Configuration milestones (weeks 2-5):
Training (weeks 4-6):
The go-live rules that separate successful implementations from expensive failures:
The 90-day milestones that validate the investment:
Fabrico's onboarding team tracks these milestones with you, not as a vendor checking boxes, but as an implementation partner accountable for your outcomes.
The software is not the long pole and never was. Vendor-side configuration for a CMMS layer is measured in days: Fabrico quotes 3 days of Fabrico-side setup covering configuration, users, roles and bulk import, with bulk import support plus live and on-site training. The long pole is your asset register, meaning one naming convention, duplicates removed and criticality assigned, which is weeks of your own time regardless of vendor and is fully portable across any vendor you pick. The second long pole is adoption, which is decided in the first eight weeks and is why a first release should cover reactive work and the register only, with preventive plans layered in afterwards. If OEE is in scope, treat it as a separate timeline: connecting machines is physical work paced by your equipment and line access, not by software configuration. Support response is contractually under 2 hours.