Proof story · European defence manufacturer · Manufacturing performance platform · MES, OEE, CMMS & AI OEE from 20% to 62% in three months

No PLC changes. No production stops. How one plant took FANUC CNC lines from 20.03% to 61.66% OEE, scaled to 80 machines in 6 weeks, and what you can copy on Monday.

OEE after three months61.66%Up from 20.03% on FANUC CNC lines
80 machines in 6 weeks

The starting point

For every scheduled hour, 12 minutes of good parts

That is what 20.03% OEE means: one fifth of the output the machines could make in the time they were planned to run. Downtime without a reason can’t be priced, ranked or fixed, so the first job was to see every stop.

Good outputHidden factory

How the MES and OEE rollout worked

What made speed possible

No PLC changesNothing in the control logic was touched.
No production stopsLines kept running during the rollout.
One implementation partnerRolled out together with Nexus IIOT.

The results after three months

About three times the good output from the same machines

OEE61.66%Up from 20.03%, same FANUC CNC lines, same scheduled hours.
−73%unclassified downtime
−96%time spent on reporting
  1. 1

    Name every stop before you fix any

    Unclassified downtime fell 73%. Once stops had reasons, the biggest losses were obvious.

  2. 2

    Stop reporting, start acting

    96% less time on reports means hours back for the people who solve problems.

  3. 3

    Scale without stopping the lines

    No PLC work and no production stops meant 80 machines in 6 weeks.

For your next morning meeting

Four questions to ask your own team

If the answers take more than a minute to find, your hidden factory is probably bigger than you think.

  • What share of our downtime has no reason attached?
  • How many hours a week go into building OEE reports?
  • Which of our lines could connect without touching a PLC?
  • What does one minute cost on our bottleneck? Find out

Download the proof story

7 pages, with four questions to ask your own team at the next morning meeting.

Customer name withheld at their request. Implementation partner: Nexus IIOT. Results as reported for the first three months. Extra output becomes profit when you can sell it; if you can’t, the same gain comes back as fewer hours and less overtime.

More in the loss price tag toolkit

Keep going: price, prove, recover

Calculator€0 · 3 min

What does one minute of downtime cost on your line?

Five numbers, then every loss ranked by euros, not minutes.

Open the calculator
Guide€0 · 30 days

Find your hidden factory in 30 days

Seven steps from true OEE to a verified result, starting at the bottleneck.

Read the guide

FAQs

Which machines were connected?

FANUC CNC lines at a European defence manufacturer, scaled to 80 machines in 6 weeks.

Did the rollout need PLC changes or production stops?

No. Nothing in the control logic was touched and the lines kept running during the rollout.

Who implemented it?

Fabrico rolled out the MES and OEE software together with its implementation partner Nexus IIOT.

See it on your own lines

Every loss priced in real time: book a live demo

Bring one line and one week of stops. We'll show you what they cost in Fabrico's financial impact module and which loss to fix first.

Or start with a pilot, in four moves

  1. 1Connect one representative line
  2. 2Measure its losses in money
  3. 3Act on the highest-value ones
  4. 4Prove the recovered value

A pilot site is operational in days, with minimal disruption to your teams.

Free download

Where should we send updates?

You get the files right away. We use your details to send related resources and may contact you about Fabrico. See our privacy policy.

30-minute call with Blaga

Book a demo

Loading the calendar…

Calendar not showing?Open the booking page
By clicking the Accept button, you are giving your consent to the use of cookies when accessing this website and utilizing our services. To learn more about how cookies are used and managed, please refer to our Privacy Policy and Cookies Declaration