Menu

FMCG production capacity pilot · Manufacturing performance platform · MES, OEE, CMMS & AI Find the capacity you already own.

Running at full capacity, on overtime or weekend shifts, or evaluating a new line? Before you invest, find out how much more your existing food and FMCG lines can deliver.

01

The value proposition

Capacity case example · Illustrative example

More effective capacity from the same assets

6 linesexisting production lines
+15%effective capacity recovered per line
≈ 0.9of a new line equivalent in recovered output
$What would a new line cost you?

What the pilot runs on

Manufacturing performance platform: from machine data to recovered profit

Fabrico tracks the financial impact of production losses in real time and helps you recover output from the equipment you already have, through actionable and measurable insights. If a loss has no price tag, it has no priority.

  1. The foundation

    MES, OEE & CMMS

    Real-time production monitoring, automatic downtime tracking and OEE analytics, with maintenance management (CMMS) built natively into the same platform.

    In the pilot: Fabrico OEE platform access included; CMMS optional.

  2. Measure losses in $

    Financial impact module

    A price tag on every loss. From your own selling prices and gross margins, Fabrico shows revenue at risk and profit impact for every stop, minute by minute, at shift, line, plant and group level.

    In the pilot: powers deliverable 04, your financial case in $ value.

  3. See every loss

    Computer vision

    Cameras over the line zoom into critical and unclassified stops, suggest the real stop reason and keep the footage as evidence: jams, microstops, blockages and changeover stages.

    In the pilot: optional, agreed before launch.

  4. Act on what matters

    AI actionable insights

    Losses ranked by recoverable value. Each insight comes with evidence, an owner and a next action, such as a work order, an SOP update or training, and its result is verified against production data.

    In the pilot: drives the Act phase and your three highest-value interventions.

Customer evidence

Proven at FMCG scale

OEE customer stories

+14% output

at 27% OEE improvement within a year

Ficosota · 3 plants · 60 production lines · 500+ machines

1.8 hours a day

saving of losses for a multi-site food manufacturer

Poultry · 12 multi-point poultry processing lines for KFC · OEE for food and FMCG

“Being part of an international group, the requirements that come from group level to our production are already available in Fabrico, way ahead.”
Valentin Alexandrov Transformation Manager, Schaeffler

Other international groups that trust us

  • ABB
  • Schaeffler
  • Hitachi Energy
  • Lufthansa Technik
  • kdc/one
  • AkzoNobel
  • Ficosota
02

The 6-week OEE pilot

FMCG OEE pilot · one line · under 6 weeks

Approach

From machine data to a capacity decision

A focused engagement on one representative line, delivered within less than 6 weeks. Built for the realities of food and FMCG lines: frequent changeovers, microstops and SKU mix.

Phase
Week 1
Week 2
Week 3
Week 4
Week 5
Week 6
01Connect
Week 1
02Measure
Weeks 1–3
03Act
Weeks 3–5
04Prove
Weeks 4–6
Executive readout
Week 6
  1. Week 1

    01 Connect

    Install sensor + hub (or SCADA). Agree KPIs, products, shifts, target speed, loss categories.

  2. Weeks 1–3

    02 Measure

    Machine-verified baseline and loss: stops/microstops, speed, changeovers.

  3. Weeks 3–5

    03 Act

    Review recurring losses, prioritize interventions and next steps.

  4. Weeks 4–6

    04 Prove

    Measure improvement and quantify the opportunity of further optimization.

Week 6 · Executive readout

Findings, recoverable capacity and a scale / no-scale decision with your plant or operations leader.

Deliverables

What you receive

  • 01 Machine-verified loss profile

    A credible baseline and quantified view of where your line loses capacity.

  • 02 Your recoverable capacity, quantified

    An evidence-based estimate for your line, with assumptions and constraints stated.

  • 03 Three highest-value interventions

    Prioritized actions to recover capacity, with agreed owners and next steps.

  • 04 Financial case in $ value, where data allows

    Recoverable hours, output and $ value, with production value shown separately from achievable margin.

Success plan · agreed with your line owner before launch

  • ≥95%Data captured for ≥95% of scheduled production time
  • ≥80%Baseline validated by your team; loss Pareto covering ≥80% of lost time
  • 3 lossesThree prioritized losses and interventions with measured impact
  • OpportunityExecutive readout in Week 6 evaluating the opportunity with a scale / no-scale decision
03

Scope, security and machine connectivity

Included in the fee

  • SICK industrial optical sensor and hub
  • Remote-guided or on-site installation with your team
  • Fabrico OEE platform access for the pilot
  • Weekly check-ins and the Week 6 executive readout

Site, IT and security

Optional, agreed before launch

Customer inputs

What we need from your team

People
A line owner and an operations sponsor, and time to review losses and actions
Site access
Site access and installation approvals
Data
Product, shift and target-speed data; production and quality records where needed
Financial case
Operating hours, demand, product mix and contribution-margin or cost data
04

Commercial terms

Proposal

Before you invest in more capacity, find out how much you already have

$7,500

Discounted from $15,000

Industrial-grade sensor and hub, installation, platform access and a Week 6 executive readout.

100%

Of the fee credited

Credited against your first-year subscription upon a successful rollout. How Fabrico is priced

Production capacity pilot FAQs

How long does the production capacity pilot take?

Under 6 weeks, on one representative line. Connect takes week 1, measure weeks 1 to 3, act weeks 3 to 5 and prove weeks 4 to 6, followed by the executive readout in week 6.

What does the pilot cost?

The pilot fee is $7,500, discounted from $15,000. It covers the industrial-grade sensor and hub, installation, platform access and the week 6 executive readout. 100% of the fee is credited against your first-year subscription upon a successful rollout.

Do we need to connect Fabrico to our PLCs or IT network?

No. The pilot runs as a standalone setup with a SICK industrial optical sensor and hub. Connection via your gateway or PLCs is optional and subject to a technical assessment. See machine connectivity.

Who owns the data, and where is it hosted?

All the data is your data. It is hosted in the USA, and Fabrico is certified to ISO/IEC 27001, ISO/IEC 20000-1 and ISO 9001. See security.

What do you need from our team?

A line owner and an operations sponsor with time to review losses and actions, site access and installation approvals, and product, shift and target-speed data. For the financial case, we need operating hours, demand, product mix and contribution-margin or cost data.

What happens after week 6?

In the executive readout we present the findings and your recoverable capacity, and you make a scale / no-scale decision with your plant or operations leader. If you roll out, the pilot fee is credited against your first-year subscription.

Next step

Book a 30-minute line-selection call

Fabrico · Manufacturing Performance Platform

MES, OEE, CMMS & AI

  • ISO/IEC 27001
  • ISO 9001
  • ISO/IEC 20000-1
  • SAP Silver Partner

Production capacity pilot

Book a 30-minute line-selection call

We use your details only to arrange the call. See our privacy policy.

By clicking the Accept button, you are giving your consent to the use of cookies when accessing this website and utilizing our services. To learn more about how cookies are used and managed, please refer to our Privacy Policy and Cookies Declaration