Mock Recall: A 4-Hour Trace Drill With Pass Marks and a Scoring Sheet

Mock Recall: A 4-Hour Trace Drill With Pass Marks and a Scoring Sheet

Run a mock recall in about 4 hours: the scenario, the trace back and forward, quantity reconciliation, pass marks from regulators, and a costed example.
Mock Recall: A 4-Hour Trace Drill With Pass Marks and a Scoring Sheet

In short: A mock recall is a timed rehearsal of a real one: pick a lot, trace it one step back to the supplier and one step forward to every first customer, reconcile the quantities, test the contact list, and score the result. Canada requires traceability records within 24 hours of a request, the US food traceability rule sets the same limit for the foods on its list, and certification schemes and UK guidance expect the plan to be tested or reviewed at least once a year.

  • A well-run drill fits in about 4 hours, which leaves 20 hours of margin before the 24-hour regulatory limit.
  • Score time, quantity reconciliation, records format and contacts, not just "did we find it".
  • Example plant: line-level lot records shrink the scope of one cheese lot from 80,000 lb to 24,000 lb, worth $87,231 to $343,448 per event.

Guide, updated 14 November 2026. Sources are listed at the end.

Certification schemes and UK guidance expect the recall plan to be tested at least once a year, so many plants run one drill a year for the audit. The better reason is that a mock recall is the only time you find out, without a regulator waiting, how long your records take to answer three questions: where did this lot come from, where did it go, and does the quantity add up. This guide gives a drill a quality team can run in a morning, the pass marks that regulators and standards state, a scoring sheet, and what a slow trace costs in product. The drill tests the records, so the thing to get right before the first run is a lot traceability data model that links inputs, runs and shipments.

What a mock recall has to prove

A mock recall is not a search exercise. It has to show that the plant could carry out the steps of a real recall, with the records it holds today. The Canadian Food Inspection Agency's (CFIA) recall procedure guide for food businesses sets out twelve steps, from assembling the recall team to the post recall review. At step 2 the CFIA recall coordinator may ask for the food name, brand, size and lot codes, the total quantity affected, the quantity that has left your control, where it went and on which dates. That list is a good definition of what a drill must produce.

The pass marks below come from pages we read. Where a mark is our own choice, the table says so.

What is testedPass markWhere it comes from
Records handed to the regulatorWithin 24 hours of a requestCanada: Safe Food for Canadians Regulations, s. 91. US: FDA food traceability rule, for foods on its list
Format of those recordsOne plain-text file that standard software can open (Canada); an electronic sortable spreadsheet (US)CFIA traceability guidance; FDA food traceability rule
Reach of the traceOne step back to the supplier, one step forward to the first customerCFIA traceability guidance; SQF Institute tip sheet 15
QuantitiesShipped to customers plus still in your control equals the total affectedCFIA recall guide, step 6
How oftenAll elements of the recall plan tested at least once a yearSQF Institute tip sheet 15; UK FSA and FSS guidance (review at least annually)
ContactsTeam, suppliers and buyers listed, with after-hours numbersCFIA recall guide, step 1; SQF Institute tip sheet 15
Drill lengthAbout 4 hoursOur choice: a morning's work, with 20 hours left before the 24-hour limit

The Canadian rule is in force now. The CFIA's traceability guidance says documents must reach the agency within 24 hours of a request, sooner if it sees a risk to health, and if electronic, in a single plain-text file that standard commercial software can import. The US rule is coming. The FDA's food traceability rule requires records within 24 hours and an electronic sortable spreadsheet when the agency needs it during an outbreak or recall. The FDA's page says Congress directed it not to enforce the rule before 20 July 2028, and the rule covers foods on the Food Traceability List. For a plant whose products are not on the list, 24 hours is still the right design target: it is the limit Canada already applies.

The 4-hour mock recall drillSeven steps, one output each0:00Start and assembleteam from the contact list0:15Trace backinput lots and suppliers1:00Trace through the plantline and hours of each run2:00Trace forwardfirst customers, dates, quantities2:45Reconcileshipped + in stock = total3:15Test the contactsincl. after-hours numbers3:40One file, then scorefixes with owner and dateAmber: where line records decide the time24 hrecords due(CA; US rule)1 a yeartest the planat least4 hdrill target(our proposal)Time it, reconcile it, score it.Then fix the slowest step.
The drill timings and the 4-hour target are our proposal; the 24-hour limit is from the CFIA's traceability guidance and the FDA traceability rule. See the source.

Certification schemes set their own tests. The SQF Institute's tip sheet on traceability and recall (2018) tells sites to test all elements of the recall plan at least once a year, to start the mock incident at either end of the process flow, and to be careful that the test does not trigger real publicity. Retailer schemes such as BRCGS and IFS have their own traceability clauses. Check the test frequency and time limit in the issue you are certified to; we could not read those texts for this guide, so we quote no number from them.

The UK's FSA and FSS guidance on traceability, withdrawals and recalls (March 2019) says traceability systems should be reviewed at least once a year, or sooner after a significant change, and that the recall plan should be reviewed annually. It suggests an incident mock exercise involving business customers, because a plan is easier to challenge after a mock than during a real event.

Before the drill: choose a scenario that can fail

A drill that always passes is picking easy lots. The test is only useful if the scenario crosses the places where records break. Choose one of these, and change it each time.

  • An ingredient or packaging lot, traced forward. The SQF tip sheet says to start at either end of the flow. Starting from a supplier lot is harder, because it usually fed several runs, lines and products. The CFIA guide warns that ingredients and packaging both trigger recalls.
  • A finished lot that spans a shift change or a changeover. Two crews, two sets of paperwork, one lot.
  • A lot that took rework. Rework carries the source lot's history into later lots, and it is often logged on a separate sheet.
  • A lot sold to a customer who repacks. Your code may not survive their pack. The case below shows why this matters.
  • A lot with stock in a third-party warehouse. Off-site stock is where reconciliations come up short.

Decide three things in advance and write them on the drill sheet: who knows the scenario (one person, the drill lead), whether customers will be contacted (if so, tell them it is a drill; the SQF tip sheet warns against triggering publicity), and the start time. Start without warning, on a normal working day, ideally on the shift with the thinnest quality cover.

The 4-hour drill, step by step

Times are targets for a mid-sized plant with one site. Each step has an owner and an output that goes into the drill file.

  1. 0:00 to 0:15. Start and assemble. The drill lead hands the recall coordinator one fact: a lot code, or a supplier lot number, and a reason ("supplier reports possible contamination"). The coordinator calls the team on the contact list, using the numbers on the list, not phones' own contacts. Output: start time, who answered, who did not.
  2. 0:15 to 1:00. Trace back. From the finished lot to every input: ingredient lots, packaging lots, processing aids, rework. From a supplier lot, to the receiving record, the quantity received and where it was stored. Output: a list of input lots with supplier, receipt date and quantity.
  3. 1:00 to 2:00. Trace through the plant. Which line, which run, which hours used the input. This is where paper systems slow down, because the receiving log says when a lot arrived, not when it was opened at the line. Output: line, start and end time of each run that used the lot, and the finished lots it produced.
  4. 2:00 to 2:45. Trace forward. From each finished lot to every first customer: name, address, contact, date shipped and quantity per lot. Include samples, staff sales and donations. Output: a distribution list in the format the CFIA guide describes at step 6, by food and lot code.
  5. 2:45 to 3:15. Reconcile. Quantity made, minus quantity shipped, minus quantity in stock on site and off site, minus documented samples and waste. The CFIA guide's tip is the test: if shipped plus still in your control is less than the total affected, review the customer list or the inventory. Output: the reconciliation with the percentage accounted for and the gap explained.
  6. 3:15 to 3:40. Test the contacts. Call two customers' recall contacts and one supplier, and say it is a drill. Check the after-hours numbers for the team. Output: who was reached and how long it took.
  7. 3:40 to 4:00. Package and score. Put the records in one file, in the format your regulator would ask for, and score the drill on the sheet below. Output: score, total time and a list of fixes with owners and dates.

If the drill passes the 4-hour mark, keep going and record the real end time. A drill that takes 7 hours is useful data. A drill stopped at 4 hours and marked "nearly done" is not.

Scoring sheet

Print this, fill it in during the drill, and keep it with the drill file. The point values and the time and percentage bands are our proposal; the 24-hour limit and the reconciliation test come from the regulators cited above.

ItemFull pointsPartialMax
Trace back: every input lot with supplier, receipt date and quantityAll inputs found5 if one input or rework is missing10
Trace through the plant: line and time window per runLine plus start and end time5 if only the production day is known15
Trace forward: every first customer with date and quantity per lotAll customers, incl. samples and off-site stock8 if one customer or location is found late15
Quantity reconciliation99% or more, gap explained10 for 97 to 99%; 5 for 95 to 97%20
Time to a complete answerUnder 4 hours8 for 4 to 8 hours; 3 for 8 to 24 hours15
Records in one file a regulator can readOne plain-text or sortable spreadsheet file5 if scanned paper or several files10
Contacts reached, incl. after hoursAll on the first try5 if one number is wrong or dead10
Fixes logged with an owner and a dateYes05
TotalFail regardless of score: over 24 hours, or under 95% reconciled100

Track the score and the time from drill to drill. A plant that runs quarterly traces between annual mock recalls sees whether its fixes work, rather than finding the same gap a year later.

Case: the Clover Hill Dairy cheese recall, June 2026

This case is about the trace, not the cause. Nothing below is a judgement on how the companies involved handled it. The facts are from the FDA's outbreak investigation page (last updated 26 August 2026) and the Maryland Department of Health advisory of 14 June 2026.

Date (2026)What happened, as the FDA and Maryland report it
13 MayA New York county health department reports two related Listeria illnesses to the state agriculture department; both people bought food at one retailer
14 May, thenThe state health department confirms both ate requeson, a soft cheese like ricotta, from that retailer. Of five samples taken there, one, repacked by the retailer, tests positive
27 MayAn inspection at the retailer's cheese distributor identifies the maker as Clover Hill Dairy of Mechanicsville, Maryland
30 MayMaryland suspends the facility's operating license
3 JuneClover Hill Dairy recalls its requeson and soft ricotta
5 JuneThe distributor recalls 1-lb clamshells repacked from batch 2AA051526, sold in New York from 15 to 28 May
18 JuneThe recall expands to all Clover Hill Dairy cheese on the market, after a second advisory from Maryland on 14 June
26 JuneA further firm recalls repackaged requeson with an expiry date of 10 July 2026, distributed from 11 May to 1 June
26 AugustThe FDA closes its investigation: 15 illnesses in 4 states, 14 hospitalisations, 1 death

The positive batch was found in an unopened 18-lb bucket with a sell-by date of 14 June 2026 and batch number 2AA051526. The FDA's list of recalled products runs from 3.2-oz snack packs to 40-lb sizes. The expanded recall notice of 18 June says products may be relabeled under other brand names, and tells buyers to look for the manufacturer permit number 24-128 on clamshell containers.

What this case teaches about running a drill

  • Fourteen days from retailer to maker. The illnesses were reported on 13 May and the maker was named after an inspection at the distributor on 27 May, because the cheese had been repacked at retail. The forward trace ends at the first customer, but the plant's code has to survive what that customer does. Put one scenario in each year's drill where the customer repacks, and check that your bulk containers carry the plant number and batch in a form the repacker can copy onto their pack.
  • Permit number 24-128 was the identifier that survived relabeling. Brands changed downstream; the plant number did not. In the drill, take a finished pack from a customer's shelf, if you can, and see whether the plant and lot can still be read from it alone.
  • One 18-lb bucket became 1-lb clamshells. Batch 2AA051526 left the plant in bulk and reached shoppers in a different size, sold from 15 to 28 May. A drill that only lists cases shipped misses the question a regulator asks next: which customers break bulk, and do you know it?
  • One product on 3 June, all cheese on 18 June. The notices do not say the expansion was a records problem. With an environmental sample matching the outbreak strain, the site itself was the common factor. The drill question is the shared-path one: for the lot you chose, which other products shared the room, the equipment and the crew, and can your records show it within the morning?
  • Dates and expiry per customer. The later notice by a repacking firm gives an expiry date of 10 July and a distribution window of 11 May to 1 June. That is what a downstream business needs from your records to write its own notice. Score the forward trace on whether it gives ship dates and expiry dates per customer, not just a customer list.

The next case will be added under this one, with its date in the heading.

Worked example: what a slow trace costs

Example plant. Every figure in this section is example data except the two unit values, which are sourced. The plant is not any company named above, and the sums are not an estimate of any recall.

A plant cuts and packs cheddar from 40-lb blocks on two lines, two 8-hour shifts a day. Each line packs 1,250 lb an hour, so 20,000 lb a day. On Monday it receives supplier lot B-0412: 600 blocks, 24,000 lb. The quarterly drill starts from that lot: the supplier has reported a possible problem.

The same lot, traced with two levels of record:

Drill A: day recordsDrill B: line records
What the plant recordsReceiving log; daily batch sheet lists the block lots used that dayBlock pallet scanned at the line infeed when opened, with time; pack code carries line and hour
What the trace findsLot B-0412 used on Tuesday and Wednesday, line unknownLine 1, Tuesday 06:00 to 22:00 and Wednesday 06:00 to 09:12
Product in scope2 days x 2 lines x 20,000 lb = 80,000 lb19.2 run hours x 1,250 lb = 24,000 lb
Time to a complete answer6 h 40 min1 h 55 min
Reconciled96% of the two days' output99.6% of the lot; the gap is logged trim and samples
Score on the sheet63 (passes, with fixes)95

Drill A is not a strawman. Daily batch sheets that list the lots used meet the one-step-back, one-step-forward rule, and a 6-hour trace is well inside the 24-hour limit. Its weakness is what it cannot rule out: without the line and the hours, both lines for both days stay in scope.

Same lot, two drillsExample plant: cheddar lot B-0412, 24,000 lbProduct in scopeA: day records80,000B: line records24,000 lbHours to a complete answerA: day records6.7 hB: line records1.9 h56,000 lb kept out of scope is worth$87,231USDA wholesale, $1.5577/lb$343,448BLS retail, $6.133/lb
Example plant data. Unit values: USDA AMS cheese price average and BLS average retail price for cheddar, both September 2026.

The value per pound, from two sources

  • Low: what the cheese is worth at wholesale. The USDA Agricultural Marketing Service's announcement of advanced prices and pricing factors, dated 21 October 2026, gives a September 2026 cheese price average of $1.5577 a pound, one of the product price averages used in federal milk order formulas. It is a bulk commodity price, below what a cut and wrapped pack sells for.
  • High: what a shopper pays. The Bureau of Labor Statistics average retail price for natural cheddar was $6.133 a pound in September 2026, US city average.

The sums, against the realistic Drill A baseline:

  • Product kept out of scope: 80,000 minus 24,000 = 56,000 lb, or 112,000 packs of 8 oz.
  • At wholesale: 56,000 x $1.5577 = $87,231.
  • At retail: 56,000 x $6.133 = $343,448.

That is per event, on one lot. The range leaves out freight, retailer charges, destruction, the investigation and lost sales, so it is a floor. It also assumes the product had shipped. If it is still in the plant, the same records turn a recall into a hold of 24,000 lb instead of 80,000 lb, and two days' quality in OEE terms is 70% sellable instead of zero.

Time has its own cost. The 4 h 45 min between the two drills is the time a real team would spend before it could tell customers which product to pull, while product keeps selling. The faster answer does not change what was made, but it changes how much of it reaches shoppers before the notice does.

Book a demo and see OEE and losses per line and shift.

Where drills usually lose time

Where it stallsWhat you see in the drillThe fix
Receiving to lineThe lot's arrival is logged, its use is notLog the input lot at the line when a pallet, bag or reel is opened, with the time
Shift handoverTwo sheets for one run; the second crew's lots are missingOne run record that both shifts write to
ReworkRework added to a later batch with no source lotRework logged as an input with source lot, quantity and time
Code readingDifferent sites read the same code differentlyOne decoder page for every code format
Off-site stockThe reconciliation comes up shortThird-party stores on the stock report by lot, checked in the drill
Records formatAnswer exists, but in scans and five spreadsheetsAn export in one file, in the regulator's format
ContactsA customer's recall contact has left; after-hours numbers ring outContact list reviewed after each drill and each staff change

Most of these sit in the plant, between receiving and dispatch. In the example plant the trace back to the supplier and forward to the customers took under an hour each in both drills, because purchase orders and invoices already carry lot numbers. The middle step, which line and which hours, is the one that turns a 2-hour drill into a 7-hour one. It is also the step that decides the scope; how to keep a food recall narrow covers the lot codes and time windows that set it. Production tracking software that records runs, orders and counts per line closes that gap with data the plant collects anyway. The difference between tracing lots and tracing what they became is covered in traceability vs genealogy.

Which record setup fits your plant

There are three usual ways to hold the records a drill reads. The times are example data, in line with the example plant above; your own first drill is the real measure.

SetupSmallest scope it can proveDrill time (example data)Fits a plant thatAsk before you choose
Paper batch sheets and receiving logA production day, all lines in the room6 to 7 hoursRuns one product per room per day, or has very short shelf life and small daily volumeCan we find last month's sheets in 15 minutes? Who reads the handwriting at night?
Spreadsheets fed from paperA production day per line, if the line is written down3 to 5 hoursHas one person who owns the file and keeps it currentWhat happens when that person is on holiday? Is the file the one the regulator would get?
Input lots logged at the line, plus line data (runs, stops, counts)The hours of one line that used the lotUnder 2 hoursRuns several products or lines from shared inputs, or ships to customers who repackDoes the system export one file in the regulator's format? Does it record the time an input was opened, not just received?

The money in the worked example is the case for the third row: one event on one lot was worth $87,231 to $343,448 of product kept out of scope. A plant that runs one product a day in one room gains less, because the day is already the natural lot.

How the US FDA frames a mock recall

The FDA's guidance on initiation of voluntary recalls (March 2022, non-binding) says a firm that expects complex recalls may want mock recalls to verify its readiness, and that they familiarise staff with the process. It also suggests setting metrics for the recall plan and changing procedures or training if a mock or actual recall falls short. On coding, it says firms should code products well enough to allow positive lot identification, and that coding helps a firm define and limit the scope of a recall. Where a product carries no code, the scope becomes the units distributed in a date range. That last point is the cost of weak coding in one line.

What quality, production and maintenance managers do next

This week

  1. Quality: pull last year's mock recall file and write down its total time and its reconciliation percentage. If neither was recorded, that is the first fix.
  2. Production: pick one input lot used last week and ask the shift lead to name the line and the hours it ran, from records only. Time it.
  3. Maintenance: list which equipment is shared between products in the room with the highest volume: fillers, slicers, conveyors, tools. The drill's shared-path question needs that list.

This quarter

  1. Run the 4-hour drill with an unannounced start, using a supplier lot that crosses a shift change.
  2. Score it on the sheet and set a target for the next drill: time down, reconciliation up.
  3. Log input lots at the line on the highest-volume line first, with the time each pallet or bag is opened.
  4. Build the export your regulator would ask for, one file, and test that it opens on another computer.
  5. Add a repacking customer to next year's scenario list, and check what your bulk labels carry.
  6. Count held product as quality loss in OEE, so a wide hold is visible next to speed and downtime.

The line record is the part day-level records are missing. OEE software records run time, stops and counts per line automatically, and a light MES ties those hours to orders and products, which is what the trace-through-the-plant step needs.

How Fabrico fits

Fabrico is a cloud OEE and light MES platform, not a recall or food safety system: lot records, supplier approval and recall procedures stay with your quality team. What it adds to a drill is the time record of each line: orders, run hours, stop times and counts, with OEE and losses by machine, line and shift, from the PLC or a Fabrico IoT device, and the reasons operators add on a tablet or phone.

On manual stations, AI cameras (an add-on) count output.

Book a demo and see good output per line and shift.

What people ask next

How long should a mock recall take?

Aim for a complete answer, back to the supplier, forward to every first customer and reconciled, in about 4 hours. That is our target, not a legal one. The legal limit to keep in mind is 24 hours: Canada's Safe Food for Canadians Regulations require records within 24 hours of a request, and the US food traceability rule sets the same limit for the foods on its list. A drill that needs most of a day leaves no margin.

How often should a plant run a mock recall?

At least once a year. The SQF Institute tells sites to test all elements of the recall plan at least once a year, and UK FSA and FSS guidance says to review the recall plan annually, suggesting a mock exercise to do it. Short trace tests between annual mock recalls, for example once a quarter, show whether the fixes from the last drill work.

What is the difference between a mock recall and a traceability exercise?

A traceability exercise checks that the records link inputs, runs and shipments. A mock recall tests the whole recall plan: the team, the contact list, the decision, the trace, the reconciliation and the notice. The SQF Institute's tip sheet says to test the full process, including recall contacts, communications and actions on the affected product.

What percentage of product must a mock recall account for?

The pages we read give a test rather than a percentage. The CFIA's recall guide says the quantity shipped to customers plus the quantity still in your control should equal the total quantity affected; if it is less, review the customer list and the inventory. Our scoring sheet gives full marks at 99% or more with the gap explained, and fails a drill under 95%.

Do we have to contact customers during a mock recall?

Not necessarily, but testing the contacts is part of testing the plan. Call a few customers' recall contacts and say it is a drill. The SQF Institute warns not to trigger real publicity, and the UK guidance suggests mock exercises that involve business customers.

What records should a mock recall produce?

A drill file with the start and end time, the input lots and suppliers, the line and hours of each run, a distribution list by food and lot code with dates and quantities, the quantity reconciliation, the contacts reached, the score and the fixes with owners and dates. Keep the trace export in one file, in the format your regulator would ask for.

Sources

All sources accessed on 14 November 2026. Dates are the publication dates shown on each page.

Track OEE and downtime in real time
See where lines lose time
Book a live demo.
See where lines lose time
See where lines lose time

Real Fabrico tiles, sample data.

By clicking the Accept button, you are giving your consent to the use of cookies when accessing this website and utilizing our services. To learn more about how cookies are used and managed, please refer to our Privacy Policy and Cookies Declaration