Depositor OEE: Deposit Accuracy, Stops and the Cost of Giveaway
In short
- Count at the core machine: depositor OEE is run time against planned time, strokes a minute against the rated speed for that batter, and good muffins against every cup offered.
- Every deposit error has a floor check: tails, drips, empty cups, doubles and drift each show in ten strokes or one weighing. The table below gives the cause, OEE factor and owner.
- A piston meters volume, not weight: when batter warms or loses air, every deposit changes weight at once and the pack spread grows.
- Price the speed: in the worked example, 20 strokes a minute instead of 22 saves EUR 106.26 a shift, EUR 53,555.04 a year, while OEE falls from 85.1% to 78.0%.
- Sold out changes the answer: if every extra pack sells at EUR 0.48 margin, 22 strokes earns more. Fixing the spread at 22 is worth EUR 250.70 a shift either way.
Depositor OEE is the share of planned time a batter or filling depositor spends making good deposits at its rated stroke rate. Count it at the depositor: run time against planned time, strokes against rated, good cups against cups offered.
Then price the weight spread, because OEE counts a heavy muffin as good.
Depositor accuracy sets the pack weight after the oven. Look for cake depositor stops in three places: the batter, the nozzles and the tray index.
This page gives a deposit-error table, the legal pack weight maths and a priced example: a 12-nozzle muffin depositor on a two-shift line in Ireland.
What depositor OEE measures, and where to count it
On a muffin or cake line the depositor feeds the oven, the cooler, the depanner and the packer. It is the core machine: the oven bakes what the depositor puts in the trays, and nothing downstream can make up a cup that was never filled.
So read line OEE at the depositor, and take the good count from the end of the line.
| Factor | What to count | Where it comes from |
|---|---|---|
| Availability | Planned time minus tray jams, waiting for batter and cleaning beyond the standard | Depositor run signal, stop reasons |
| Performance | Strokes a minute against the rated strokes for that batter and tray | Stroke count |
| Quality | Good muffins out of every cup offered (strokes x nozzles) | Packs passing the checkweigher, rejects at the depanner |
| Beside OEE | Pack mean and spread in grams | Checkweigher statistics after the cooler |
Three rules keep the number clean:
- Cups, not trays: one stroke offers one cup per nozzle. A 12-nozzle depositor at 20 strokes offers 240 cups a minute, whether or not each cup gets batter.
- Rated per product: set one rated stroke rate per batter and tray, at the accuracy you need. A thin sponge batter and a muffin batter with fruit pieces do not share a rated speed.
- Downstream stops keep their owner: if the oven, cooler or packer holds the line, log it with its own stop reason, so the depositor is not charged for it.
Short stops at the tray index, a second or two each, are hard to catch on a paper log. Count them from the machine signal, as the page on micro-stops sets out, and price them with the same crew minute as a long stop.
The deposit-error table
Pin this at the depositor. Each error has one floor check that takes minutes, one OEE factor and one owner, so the shift meeting argues about the fix, not the blame.
| Symptom | Likely cause | Floor check | Factor | Owner |
|---|---|---|---|---|
| 1. Tail or string between cups | Batter too cold or elastic, cut-off too slow | Watch 10 strokes, take batter temperature | Q | Process technologist |
| 2. Drip from a nozzle between strokes | Worn valve or seal, no suck-back set | Stop mid-cycle, watch the nozzle for 30 s | Q | Maintenance |
| 3. Empty cup (missed deposit) | Air pocket, low hopper, cup out of place | Hopper level, cup position under the nozzle | Q | Operator |
| 4. Double or heavy deposit | Tray slipped back, two strokes on one row | Tray index sensor and end stops | Q | Maintenance |
| 5. One lane always light | Part-blocked nozzle, worn piston seal | Weigh 10 deposits per nozzle | Giveaway | Maintenance |
| 6. All lanes drift in the shift | Batter warming or losing air | Hourly specific gravity cup and temperature | Giveaway | Mixing |
| 7. Deposit off centre | Tray guide or cup position | Mark the cup centre, check the guides | Q | Operator |
| 8. Tray jam at the index | Bent tray, dirty sensor | Pull and check the jammed tray | A | Maintenance |
| 9. Depositor waits for batter | Mixer late, transfer pump slow | Time from mixer drop to hopper | A | Mixing |
| 10. Speed turned down | Crew slowing to hide tails | Set against rated strokes, by hour | P | Shift lead |
| 11. Nozzle clean runs long | Kit not staged, parts slow to strip | Clean time against the standard | A | Shift lead |
Rows 1 to 4 are the depositor's own quality losses. A tail that lands on the cup edge bakes into a burnt drip, and a double deposit overflows and sticks to the tray. Count both as rejects at the depanner, with the cause the operator picks at the depositor.
Rows 5 and 6 cost grams, not cups. Neither stops the line, and both push the pack target up. Weigh deposits per nozzle at the start of every shift, before the first tray reaches the oven.
Rows 8, 9 and 11 are lost time. Each needs its own entry in the reason list, so the operator logs "tray jam" or "waiting for batter" as the stop reason instead of a general "depositor stop".
Row 10 hides inside performance. A crew that turns the speed down to stop tails keeps quality up and OEE looks fine; only the set speed against rated, hour by hour, shows it.
Why deposit weight drifts: volume, density and heat
A piston depositor meters volume. Each stroke pushes the same volume of batter through each nozzle, and the weight in the cup is that volume times the batter's density.
So any change in density changes every deposit at once. Batter that warms in the hopper, or holds less air than the last mix, changes weight per stroke with no change on the depositor screen.
Flow matters too. A study in European Food Research and Technology found that cake batters were shear thinning and fitted a power law model, and that more fat or an added emulsifier lowered apparent viscosity (Sakiyan, Sumnu, Sahin and Bayram, 2004).
Shear thinning means the batter flows more easily the faster it is pushed. On a depositor, piston speed and recipe both change how batter flows and how cleanly it breaks off at the nozzle. That is why a new recipe needs its own rated speed and its own trial.
Three checks that catch drift early
- Specific gravity cup: fill a cup of known volume with batter, weigh it and divide by the weight of the same cup of water. Do it at the mixer and at the hopper, every hour.
- Batter temperature: at the hopper, every hour, against the recipe's set range.
- Deposit weight per nozzle: 10 deposits per nozzle at start-up and after every stop longer than 15 minutes.
Plot all three by hour on one sheet. If deposit weight moves in step with specific gravity, the cause is in mixing or transfer, not the depositor. If one nozzle drifts alone, look at that nozzle and its seal.
After a long stop, check the first trays first. The batter in the hopper has waited longest, and its temperature and air content are the furthest from the recipe.
From batter grams to the legal pack weight
In Ireland, as across the EU, e-marked packs follow the average system of Directive 76/211/EEC. Its first rule is that the actual contents shall not be less, on average, than the nominal quantity. It covers packs from 5 g to 10 kg.
The weight that counts is the packed weight. The GB guidance on the Packaged Goods Regulations 2006, which sets out the same average system for Great Britain, states that all products are required to meet the packers' rules at the time of packing.
For a muffin line that means after the oven and the cooler. The depositor sets batter grams; the rules look at baked grams in the pack.
The three rules as one target
The GB guidance turns the three packers' rules into a target for a process with standard deviation s. For a 280 g pack the tolerable negative error (TNE) is 9 g, from its table for 200 to 300 g. The target mean must be the greatest of:
- the nominal quantity, 280 g;
- 280 - 9 + 2s;
- 280 - 18 + 3.72s.
Where s stays below half the TNE, the guidance says the average rule is the critical one. For a 280 g pack, half the TNE is 4.5 g. Above that, the target always has to sit above the label weight.
Four muffins, one pack
A pack of four carries four deposit errors. If the four weights vary independently, the pack spread is the single-muffin spread times the square root of 4: twice as wide, not four times. A muffin spread of 2.4 g gives a pack spread of 4.8 g.
That holds only for random errors. A nozzle that always runs light, feeding the same pack position, adds its full bias to every pack. Lane bias does not average out, so fix it before tuning anything else.
Bake loss turns pack grams into batter grams
Batter loses weight in the oven and cooler. With an 11% loss (sample figure), each baked gram needs 1 ÷ 0.89 = 1.12 g of batter. Set the stroke from the pack target: batter per cup = pack target ÷ 4 ÷ 0.89.
The oven adds its own spread to the depositor's. That is why the pack spread is measured at the checkweigher after the cooler, not estimated from deposit weights alone.
Checkweigher set points
The same guidance says checkweigher set points must allow for the zone of indecision (ZoI): where it is greater than 0.25 TNE, raise the set point by 0.5 ZoI - 0.125 TNE. Light packs rejected there are a quality loss; count them by hour.
OEE still counts a heavy pack as a good pack, so grams need their own number beside OEE, as the page on giveaway and overfill as a quality loss explains.
Worked example: muffin batter on a 12-nozzle depositor in Ireland
Food products made up EUR 23.7bn, or 17.2%, of Irish industrial net selling value in 2023, per the CSO release on industrial production by sector. The line below is an example, not a customer's. Sample figures are labelled; replace them with your own trial data.
Inputs
- Line: 12-nozzle piston depositor filling paper cups in trays, then a tunnel oven, cooler, depanner, flow wrapper and checkweigher. Rated 22 strokes a minute on this batter (sample figure), so 264 cups a minute.
- Product: e-marked packs of four muffins, 280 g (4 x 70 g).
- Shifts: two 8-hour shifts a day. Each has 435 minutes of planned production: 480 minutes less 30 of breaks and a 15-minute standard nozzle clean.
- Stops: 60 minutes a shift (sample figure): 12 of cleaning beyond the standard, 18 of tray jams, 14 waiting for batter and 16 of other stops. Run time is 375 minutes.
- Calendar: 21 days a month (42 shifts) and 252 a year (504 shifts).
- Labour: EUR 42.40 an hour, the 2025 hourly labour cost for Irish manufacturing in Eurostat lc_lci_lev, the latest year available. A crew of 6 (sample figure) costs EUR 254.40 an hour, EUR 4.24 a minute.
- Product cost: batter at EUR 2.40 a kg (sample figure). With the 11% bake loss a baked gram costs 2.40 ÷ 0.89 = EUR 2.70 a kg. A rejected muffin costs EUR 0.20 in batter and cup (sample figure).
- Margin: EUR 0.12 a muffin, EUR 0.48 a pack (sample figure).
- Buffer: the target sits 1.5 g above the legal floor (sample figure).
Light-pack rejects at the checkweigher, and the 48 minutes of tray jams, waiting for batter and other stops, are left out of the loss bill below to keep the arithmetic short; count and price them on your line.
Trial at three speeds (sample figures)
| Strokes a minute | Pack spread (SD) | Empty cups / rejects | Giveaway per pack | OEE |
|---|---|---|---|---|
| 22 | 5.6 g | 0.5% / 0.8% | 4.4 g | 85.1% |
| 20 | 4.8 g | 0.2% / 0.3% | 2.1 g | 78.0% |
| 18 | 4.2 g | 0.1% / 0.2% | 1.5 g | 70.3% |
OEE is availability (375 ÷ 435 = 86.21%) times performance (strokes ÷ 22) times quality (good muffins ÷ cups). At 22: 375 x 264 = 99,000 cups, 495 empty, 792 rejected and 97,713 good, so quality is 98.70% and OEE is 85.09%.
Giveaway comes from the three rules. At 22: 271 + 2 x 5.6 = 282.2 g, and 262 + 3.72 x 5.6 = 282.83 g. The floor is 282.9 g rounded up; add the 1.5 g buffer and the mean is 284.4 g, 4.4 g over the label.
At 20: 271 + 2 x 4.8 = 280.6 g is the highest, so the mean is 282.1 g. At 18 the spread is under 4.5 g, the average rule binds and the mean is 281.5 g.
In batter, 22 strokes needs 284.4 ÷ 4 ÷ 0.89 = 79.89 g a cup. At 20 strokes it is 79.24 g. The giveaway side of the speed question is 0.65 g of batter per cup.
The loss bill at 22 strokes a minute
| Loss | Per shift | Per month (42) | Per year (504) |
|---|---|---|---|
| Giveaway: 24,428.25 packs x 4.4 g | EUR 290.21 | EUR 12,188.82 | EUR 146,265.84 |
| Doubles and tail rejects: 792 muffins | EUR 171.12 | EUR 7,187.04 | EUR 86,244.48 |
| Missed deposits: 495 cups | EUR 7.95 | EUR 333.90 | EUR 4,006.80 |
| Cleaning overrun: 12 minutes | EUR 50.88 | EUR 2,136.96 | EUR 25,643.52 |
| Total | EUR 520.16 | EUR 21,846.72 | EUR 262,160.64 |
- Giveaway: 97,713 good muffins make 24,428.25 packs. At 4.4 g each that is 107.48 kg x EUR 2.70 = EUR 290.21.
- Rejects: 792 x EUR 0.20 = EUR 158.40 of batter and cups, plus 3 minutes of crew time to make them again (792 ÷ 264 cups a minute) at EUR 4.24 = EUR 12.72.
- Missed deposits: only the time, 495 ÷ 264 = 1.875 minutes x EUR 4.24 = EUR 7.95.
- Cleaning overrun: 12 minutes x EUR 4.24 = EUR 50.88.
Missed deposits look cheap because the batter stays in the hopper. If every pack sells, price them at margin instead: 495 x EUR 0.12 = EUR 59.40 a shift, EUR 29,937.60 a year.
Giveaway is 56% of the bill. One gram on every pack at 22 strokes costs 24.43 kg x EUR 2.70 = EUR 65.96 a shift, as much as 15.6 minutes of crew time.
Slow down, accept giveaway or fix the spread
Slowing to 20 strokes cuts the spread and the rejects, but the shift makes fewer muffins. To compare like with like, each speed has to make the same 97,713 good muffins as the shift at 22, with extra crew minutes and the same stops.
Extra minutes = 97,713 ÷ good muffins a running minute - 375. At 20 strokes that is 240 x 99.5% = 238.8 a minute, so 409.18 - 375 = 34.18 minutes. At 18 strokes it is 216 x 99.7% = 215.35 a minute, so 78.74 minutes.
| Speed | Giveaway | Rejects | Extra crew time | Total a shift |
|---|---|---|---|---|
| 22 | EUR 290.21 | EUR 158.40 | 0 min, EUR 0 | EUR 448.61 |
| 20 | EUR 138.51 | EUR 58.92 | 34.18 min, EUR 144.92 | EUR 342.35 |
| 18 | EUR 98.93 | EUR 39.20 | 78.74 min, EUR 333.86 | EUR 471.99 |
Giveaway is on the same 24,428.25 packs at each speed. Rejects follow the cups needed: at 20 strokes, 97,713 ÷ 99.5% = 98,204 cups, of which 0.3% is 294.6 rejects at EUR 0.20.
At 20 strokes the shift saves EUR 448.61 - EUR 342.35 = EUR 106.26. That is EUR 106.26 x 42 = EUR 4,462.92 a month and EUR 106.26 x 504 = EUR 53,555.04 a year, if the trial holds across products.
OEE ranks 22 strokes first: 85.1% against 78.0%. The cost a shift ranks 20 first. Neither number picks the speed alone; put grams, rejects and minutes in the same currency first.
Going down to 18 is the wrong trade. Against 20 strokes it saves 0.6 g a pack but needs 44.56 more minutes (78.74 against 34.18), so it costs EUR 129.64 a shift more. Once the spread is under half the TNE, only a smaller buffer cuts giveaway further.
If the plant is sold out
When every extra pack sells, price speed by margin, not crew time. At 22 the shift makes 8,163 more good muffins than at 20 (97,713 against 89,550), which is 2,040.75 packs.
At their own output, 22 strokes costs EUR 448.61 in giveaway and rejects. At 20 strokes it is 22,387.5 packs x 2.1 g = 47.01 kg, EUR 126.94, plus 270 rejects, EUR 54.00: EUR 180.94 in total.
The gap is EUR 267.67, so 22 strokes pays if each extra pack earns more than EUR 267.67 ÷ 2,040.75 = EUR 0.131. At the sample margin of EUR 0.48, the extra packs earn EUR 979.56, so 22 strokes makes EUR 711.89 more a shift.
Sold out, speed wins. Not sold out, 20 strokes wins. The plan, not the depositor, decides which case applies this week.
The third option: fix the spread at full speed
If the spread and reject rate at 22 strokes came down to the levels measured at 20, the shift would keep its output and save EUR 151.70 of giveaway (290.21 - 138.51) and EUR 99.00 of rejects (792 - 297 muffins at EUR 0.20).
That is EUR 250.70 a shift, EUR 10,529.40 a month and EUR 126,352.80 a year, before counting the extra good muffins. It is the ceiling for what a fix is worth.
The candidates sit in the error table: batter temperature control at the hopper, steadier batter transfer, a nozzle or cut-off change, or weight feedback to the stroke.
Ask the supplier to run any fix at 22 strokes on your batter, and measure pack spread at the checkweigher before paying.
Nozzle cleaning and product changeovers
Cleaning is planned time with a standard. Anything beyond the standard is an availability loss, priced like any stop: in the example, 12 minutes a shift cost EUR 25,643.52 a year.
Split the clean into steps and time each one, so an overrun has a cause:
- Stop and make safe: stop the depositor and tray conveyor and isolate them under the site procedure.
- Empty and strip: run out the hopper, remove nozzles, valves and manifold parts.
- Clean and inspect: wash the parts, check seals and nozzle tips for wear.
- Rebuild and prime: refit, prime the pistons and run waste strokes until deposits break off clean.
- First-tray check: weigh 10 deposits per nozzle before the first tray enters the oven.
HSE's page on safety hazards in food and drink manufacturing says conveyors are involved in more machinery accidents in the industry than any other type of machine, and that a safe system of work should be in place for daily and routine hygienic cleaning of the conveyor.
The tray conveyor under the depositor is part of that. Clearing a tray jam by hand while the index runs is the shortcut to rule out in writing.
Design sets how long strip-down takes. EHEDG Guideline 8, Hygienic Design Principles (fourth edition, December 2025) notes that equipment with poor hygienic design is difficult to clean. EHEDG uses its criteria as the basis for its equipment certification.
Changeovers between batters and fillings
A change from plain to blueberry muffins, or from batter to a cream filling, adds steps to the clean: a new rated speed, a new stroke volume, wider nozzles where pieces need them, and a new pack target.
Run allergen-free products before allergen-containing ones where the plan allows, and make the full clean the rule when an allergen leaves the line. Time each changeover against its own standard, as the page on changeover time describes.
Reset the target after every changeover. A new batter has its own density, bake loss and spread, so the old stroke volume can be grams too high or too low. Weigh packs from the first hour and recompute the target from the three rules.
The depositor floor card: one shift, six checks
The card needs a sample scale, a specific gravity cup, a probe thermometer and the checkweigher statistics. Run it for one shift per product before changing speed, nozzles or targets.

Text version of the diagram
- Weigh 10 deposits per nozzle at start-up; a lane that is always light or heavy points at that nozzle or its seal.
- Check batter specific gravity and temperature every hour at the mixer and the hopper.
- Count empty cups and double deposits per 1,000 cups, and log the stop reason at the depositor.
- Time the nozzle clean against its standard every shift, with the kit staged before the stop.
- Weigh packs after the cooler: pack mean and spread per hour, then reset the target from the three packers' rules.
- Price giveaway grams at batter cost and lost minutes at crew cost, and pick the speed with the lowest total.
After a week you have one rated speed, one stroke volume and one pack target per product, each with numbers behind it. Write them into the product program and recheck when the recipe, the tray or the batter supply changes.
Decision: hand checks, weight control or line software
Five options give these numbers, in two groups: weight and time. A line needs at least one of each.
Weight: sample scale and checkweigher
Hand weighing per nozzle and the checkweigher's statistics give mean, spread and rejects by product. That is enough to set the pack target and find lane bias. They do not show why the line stopped, for how long, or by shift.
Weight control on the depositor
Servo stroke control, mass flow metering or checkweigher feedback to the stroke can adjust deposit weight as batter density changes. It is a machine upgrade: ask the depositor supplier for a price and a trial on your batter at your rated speed.
Time: OEE or light MES software from machine signals
OEE or light MES software reads the depositor's stroke and run signals through the line PLC or an added sensor, counts stops, short stops and output by shift, and asks the operator for a stop reason at the machine. It settles the speed and cleaning questions with counts.
What you see: a shift timeline, unclassified time waiting for a reason, and the operator's line-down screen, on sample lines. Book a demo.
Plays from YouTube. Google may set cookies when you press play. Privacy policy.
| Option | What it gives | Cost | Fits |
|---|---|---|---|
| Paper log and hand weighing | Stops by shift, weights per nozzle | Operator and supervisor time | One line, first month |
| Checkweigher statistics | Pack mean, spread, light-pack rejects | Can be part of the machine; ask about data export | Setting targets |
| Weight control on the depositor | Steadier deposits as batter drifts | Ask the supplier for a price and a trial | High giveaway at full speed |
| OEE or light MES software | Stops, short stops, counts and reasons, priced | Ask the vendor for a price per line per month | Several lines, daily meetings |
| Camera counting | Output where a station has no usable signal | Ask the vendor for a price per line per month | Older packers, manual stations |
For lists of tools, see the comparisons of OEE software for food and beverage and MES for food manufacturing, or the overview of OEE software.
Who should pick which
- One line, giveaway is the worry: hand weighing per nozzle, checkweigher statistics and a paper stop log with owners.
- Sold out at full speed: price the fix first. Weight control on the depositor may pay where slowing down does not.
- Several lines, jams and cleaning argued every week: line software from machine signals, so stops are counted and priced, not remembered.
- Old packers next to a newer depositor: signals where they exist, camera counting where they do not.
Questions to ask a vendor or supplier
- Which depositor signals can be logged: stroke count, run, fault, hopper level?
- Can the rated speed be set per product and tray?
- Can stops caused by the oven or the packer be kept apart from depositor stops?
- How are stops of one or two seconds at the tray index counted?
- Can checkweigher rejects be counted or entered beside OEE?
- Can nozzle cleaning and changeovers be timed against a standard?
- Which price and margin fields are needed to price losses, and what does it cost per line per month?
Where Fabrico fits
Fabrico is made by the publisher of this article.
- Real-time OEE (availability x performance x quality); on a linked depositor line, OEE by line and shift from the core machine.
- The depositor connects through the line PLC or a Fabrico IoT device; micro-stops come from the machine signal.
- The operator logs the stop reason at the machine in a few taps, such as tray jam or waiting for batter, set up in the reason list. Planned and unplanned stops are kept apart.
- Changeovers are tracked against a standard time; a nozzle clean can be logged as a planned stop with its own reason.
- A checkweigher reject signal from the line PLC can be counted like any machine signal, or the reject count entered; scrap is recorded by product and reason.
- With the selling price and margin of each product entered, losses are priced in money and stops ranked by financial impact. Where a station has no usable signal, the camera add-on counts output: see OEE with computer vision. Pricing is one quote per plant by machines and modules.
Sources, accessed 26.11.2026: Eurostat, Labour cost levels by NACE Rev. 2 activity (lc_lci_lev); EUR-Lex, Council Directive 76/211/EEC on prepackaged products; GOV.UK (OPSS), Weights and Measures (Packaged Goods) Regulations 2006: Guidance (GB), v3; Sakiyan, Sumnu, Sahin and Bayram, Influence of fat content and emulsifier type on the rheological properties of cake batter, European Food Research and Technology 219(6), 2004; CSO, Irish Industrial Production by Sector 2023; EHEDG, GL 8 Hygienic Design Principles, fourth edition; HSE, Safety hazards in food and drink manufacturing.
Frequently asked questions
How do you calculate OEE for a depositor?
Multiply availability (run time over planned time), performance (strokes a minute over the rated strokes for that batter and tray) and quality (good muffins over cups offered, which is strokes times nozzles). On a linked line, read it at the depositor and keep pack giveaway in grams beside it.
Why does deposit weight drift during a shift?
A piston depositor meters volume, so weight follows batter density. Batter that warms in the hopper or holds a different amount of air changes every deposit at once. Check specific gravity and temperature every hour beside deposit weights.
What causes tails and drips on a batter depositor?
Check two causes of tails first: batter that is too cold or elastic, or a cut-off that is too slow for the stroke rate. Drips between strokes point at a worn valve or seal, or no suck-back. Watch 10 strokes and the nozzle mid-cycle before changing settings.
Is a missed deposit a performance or a quality loss?
If quality counts good muffins against every cup offered, an empty cup is a quality loss: the stroke ran but made no good unit. Some plants book it as performance. Pick one rule and keep it, so shifts and lines compare.
How do you set the target weight for a pack of four muffins?
Measure the pack spread s at the checkweigher after the cooler. For a 280 g pack with a 9 g TNE, the target is the greatest of 280 g, 271 + 2s and 262 + 3.72s, plus your buffer. Divide by 4 and by one minus the bake loss to get batter per cup.
Should a depositor run slower to cut giveaway?
Only if the plant is not sold out and the saving in grams and rejects beats the extra crew time. In the worked example 20 strokes beat 22 by EUR 106.26 a shift, but 22 won once every extra pack sold at EUR 0.48 margin.
See what the depositor line loses, in money. The demo shows OEE by line and shift from the core machine, stops with the reasons operators log, and losses priced in money from machine signals.