What line problems cost: 19 guides for plant managers
In short
- 19 guides, each answering one money question: what a rush order, a power cut, a bonus design or a colour change costs.
- One shared method: measure the loss on the line, price it with your own rates, then decide with the number.
- Six guides cover moulding and metal cells: regrind, colour changes, defects, tool life, tube bending and turret punches.
Plant managers get money questions that the line data can answer. What does a rush order cost? How much should a promo pack add to the price? Is the bonus paying for real gains? Each guide here answers one such question, with a worked example carried through to euros.
The shared method
They share one method. First, measure the loss on the line, in minutes, units or kilograms, from logged stops and counts rather than from memory. Second, price it with your own rates: crew cost per hour, material cost per kilogram, margin per unit. Third, decide with the number: a surcharge, a rule, a bonus design, a tool change interval.
The second step needs the most care. Work out the cost of a minute of downtime on your line once, and reuse it in every guide below.
| Step | What you need | Where it comes from |
|---|---|---|
| 1. Measure | Minutes, units or kilograms lost | Logged stops and counts by line and shift |
| 2. Price | Crew cost per hour, material cost per kg, margin per unit | Your own finance and payroll rates |
| 3. Decide | The loss per order, shift or month | The guide for your question |
The 19 cost guides
Each guide works through its own case: its own stations or decisions, its own worked example and its own sources.
Orders, prices and customers
| Guide | The money question it answers |
|---|---|
| Rush orders | What does a late change cost the line, and what should the surcharge be? |
| Promo pack runs | How do you price a short promotional run? |
| Price increases | How do you justify a price increase to a retailer with line data? |
| Customer complaints | How do you trace a complaint to the shift, machine and batch? |
| Line count vs ERP | Which number is true, and how do you reconcile them? |
People and pay
| Guide | The money question it answers |
|---|---|
| Operator bonus on OEE | Which bonus design works, and how do teams game the others? |
| Seasonal workers | How do you staff the peak season, and what does it cost? |
| Break relief | Stop the line for breaks, or keep it running? |
Speed, recipes and raw materials
| Guide | The money question it answers |
|---|---|
| Line speed trials | How do you raise line speed without extra rejects? |
| Raw material variability | How does raw material quality change speed and scrap? |
| Recipe dosing errors | What does a wrong recipe cost, and how do you stop it? |
Stops from outside the line
| Guide | The money question it answers |
|---|---|
| Power cuts | What does a power cut cost, and how is it logged in OEE? |
| Waiting for the OEM technician | How do the waiting hours add up, and what should the contract say? |
Moulding and metal cells
| Guide | The money question it answers |
|---|---|
| Regrind in moulding | How much regrind can you add without losing money? |
| Colour changes in moulding | How do you purge less and sequence colours better? |
| Moulding defects | What causes each defect, and what does it cost in scrap and OEE? |
| CNC tool life | Change tools early, or run them until they break? |
| Tube bending cells | Where do setups and scrap cost money in a CNC bender cell? |
| Turret punch presses | Where do the minutes go on a turret punch? |
How to pick where to start
Start with the question on your desk this week. If none is urgent, start with the count: the line count vs ERP guide checks that the number every other guide relies on is right.
Then go after the loss that repeats:
- Sales changes the plan at short notice: rush orders and promo runs.
- Crews are short: break relief and seasonal staffing.
- Moulding or metal cells: tool life, colour changes and regrind.
- A retailer pushes back on price: the price increase guide, built on cost per good unit.
Questions to ask before you decide
- What did it cost last month? In euros, from logged stops and counts.
- Whose rates did you use? Crew, material and margin rates agreed with finance.
- Is the loss repeating? A one-off needs a fix; a weekly loss needs a rule.
- How fast does the fix pay back? Compare its cost with the loss per month.
From one answer to a habit
Each guide can be worked once by hand. Asking the same questions every month needs the stops and counts logged as they happen, by line and shift. That is where OEE software pays.
Where Fabrico fits
- OEE by line and shift, read at the core machine.
- Operators pick the stop reason on a tablet.
- Losses ranked by financial impact.
- Where a machine has no usable signal, a camera counts output.
Fabrico is made by the publisher of this article.
Frequently asked questions
Which rates should I use to price a loss?
Your own: crew cost per hour, material cost per kilogram and margin per unit. The guides use stated example rates; replace them before you decide.
See your line losses priced in euros. A Fabrico consultant walks you through OEE by line and shift, stop reasons chosen by operators and losses ranked by financial impact.
Questions first? Contact us.