Hummus and Dips Production OEE: Kitchen, Tub Filler and HPP Pace

Hummus and Dips Production OEE: Kitchen, Tub Filler and HPP Pace

OEE on a chilled hummus tub line: find the pace set by the batch kitchen and HPP vessel, then price stops and giveaway. Worked example at 60.2% OEE.
Hummus and Dips Production OEE: Kitchen, Tub Filler and HPP Pace

In short

  • Count at the filler: OEE on a hummus and dips line is good tubs against the tub filler's rated speed over planned time.
  • Two batch steps set the pace: the blending kitchen upstream and the HPP vessel downstream decide how often the filler waits or is blocked.
  • Worked example: a 200 g tub line in Germany runs at 60.2% OEE and loses EUR 3,822 a day once stop minutes, slow running, rejects and giveaway are priced.
  • Biggest single stop: one mid-day sesame clean, 75 minutes and EUR 618.75, which sequencing can move into the end-of-day clean.
  • Giveaway eats kitchen output: 5 g over 200 g costs 61 tubs per 500 kg batch and EUR 390 a day.

OEE on a hummus and dips production line is measured at the tub filler: good tubs out, divided by what the filler could make at its rated tubs per minute over the planned time. Availability, performance and quality multiply to the same figure.

What sets a chilled dips line apart is what sits around the filler. A batch kitchen feeds it from a hold tank, and an optional high-pressure processing (HPP) vessel takes its tubs. Both run in batches, the filler runs nonstop, and in the example below 110 of the 275 stop minutes start at those two handovers.

This page covers tubs of hummus, bean dips and similar chilled spreads. Bottled and jarred sauces have their own filler, count point and losses: see OEE for sauce and condiment lines.

How OEE works when two batch steps surround one filler

The filler is the core machine. Every tub passes it, it has a rated speed per tub format, and its run signal can be taken from the line PLC. That makes it the count point and the reference for all three OEE factors.

  • Availability: run time divided by planned production time. Waiting for batch and blocked by the vessel are filler stops, each logged as its own reason.
  • Performance: tubs filled divided by run time x rated tubs per minute. Micro-stops at the denester and lidder land here.
  • Quality: good tubs divided by tubs filled. Checkweigher rejects, seal rejects, push-out tubs after a flavour change and leakers after HPP all count.

The kitchen and the vessel are not machines inside the filler's OEE. They show up as stop reasons. That is the useful part: if "waiting for batch" is one row with 64 minutes a day, the kitchen's problem is visible on the filler's numbers without a second system.

Leakers found after HPP are booked back to the day the tubs were filled. If the vessel runs a shift behind the filler, agree a cut-off time, so the quality rate is not rewritten after the daily report has gone out.

The general method behind the three factors, and what tools add to it, is covered in the guide to OEE software. This page stays with what changes on a chilled tub line.

Track OEE and downtime in real time
Book a demo

Seven stations from soak tank to case

StationWhat it doesMain lossWhere it lands in OEE
1. Soak and cookDry chickpeas hydrate, then cookLate batchFiller availability (waiting)
2. Blend or emulsifyChickpeas, tahini, oil and acid to pasteOut of spec, re-blendFiller availability (waiting)
3. Batch holdCooled paste waits in a hold tankThickening, weight driftQuality and giveaway
4. Tub fillerRotary or inline, piston dosingMicro-stops, misfeedsPerformance
5. Lid and film sealFilm seal, then snap lidSeal faults, rejectsAvailability, quality
6. HPP (optional)Baskets pressed in a vesselFull rack, part loadsAvailability (blocked)
7. Code, label, caseDate code, label, case packCoder stopsAvailability

Soaking and cooking work in hours. A university extension sheet for home cooks gives six to eight hours or overnight for a slow soak, then one and a half to two hours of simmering. Factory cook times differ by plant, but the kitchen still plans in hours while the filler counts seconds.

That gap is the reason the hold tank exists. It is also why a batch that fails a texture or taste check costs the filler more than the kitchen. The kitchen re-blends; the filler waits for every minute of it.

Three paces: kitchen, filler and pressure vessel

Before any OEE figure, write down three numbers in the same unit: tubs a minute. The lowest one sets what the line can make, whatever the filler's nameplate says.

  1. Kitchen pace = batch kg / batch cycle minutes / kg per tub.
  2. Filler pace = rated tubs a minute for the tub format.
  3. Vessel pace = tubs per load x cycles per hour / 60.

The vessel pace needs two figures: tubs per load and cycles an hour. An IFT Food Technology article gives about 6 to 8 cycles an hour, counting compression, holding, decompression, loading and unloading, with products held 3 to 5 minutes at 600 MPa in most applications.

The same article puts vessel filling efficiency at 50% to 60% for vacuum packages and pouches and 40% to 55% for bottles. Tubs are rigid, so measure the real load: count the tubs in a full basket and in an average one.

Step (sample figures)InputsTubs a minute
Kitchen, 200 g fill500 kg every 40 min62.5
Kitchen, 205 g fillSame batch, 5 g over61.0
FillerRated, 200 g format60.0
Vessel, full loads480 tubs x 7.5 cycles60.0
Vessel, part loads420 tubs x 7.5 cycles52.5
Vessel, part loads, slower420 tubs x 7 cycles49.0

On paper the line is balanced: 62.5, 60 and 60. In practice two things eat the margins. Giveaway turns the kitchen's 62.5 into 61.0, and part loads at flavour ends drop the vessel to 52.5 or 49.0.

With the vessel below the filler, the chilled rack in front of it fills while the filler runs. Once the rack is full, the filler stops with "blocked by vessel". The rack size decides how often that happens; the vessel pace decides whether it happens at all.

Floor check: count the tubs in five vessel loads in a row and time five cycles, door close to door close. Multiply average tubs by cycles an hour and divide by 60. If the answer is below the filler's rated speed, the vessel is the line's constraint.

Pressure and hold time are set for food safety, not for throughput. A peer-reviewed review in Food Science and Biotechnology gives 100-600 MPa for commercial processes and says packaging should withstand 15-20% compression of its original volume.

So throughput gains come from loading patterns, basket handling and cycle gaps, never from shortening a validated hold. The wider logic of starved and blocked machines is in starvation and blocking in line balance.

Worked example: 200 g hummus tubs in Germany

Every figure below is a sample set for this page; none comes from a customer's line. The line makes classic hummus, two flavoured hummus and one sesame-free bean dip in 200 g tubs, on two shifts, with an in-house HPP vessel.

  • Planned time: 2 shifts x 480 minutes, minus 2 x 30 minutes of breaks = 900 minutes.
  • Filler rated speed: 60 tubs a minute, so 900 x 60 = 54,000 tubs possible.
  • Crew on the line: 10 people (kitchen 3, filler and lidder 2, vessel loading 2, packing 2, team leader 1).
  • Labour cost: EUR 49.5 an hour, the 2025 figure for German manufacturing in Eurostat's labour cost levels (lc_lci_lev). One line minute costs 10 x 49.5 / 60 = EUR 8.25.
Stop reason at the fillerEventsMinutes
Waiting for batch864
Sesame clean, unscheduled175
Flavour changeovers354
Blocked by vessel446
Lidder and film seal faults622
Coder and labeller514
Total27275
  1. Availability: run time 900 - 275 = 625 minutes. 625 / 900 = 69.4%.
  2. Performance: 625 x 60 = 37,500 tubs possible in run time; 33,600 filled. 33,600 / 37,500 = 89.6%.
  3. Quality: 1,100 rejects (420 underweight, 260 seal and lid, 300 push-out after flavour changes, 120 leakers after HPP), so 32,500 good. 32,500 / 33,600 = 96.7%.
  4. OEE: 0.6944 x 0.8960 x 0.9673 = 60.2%. Check: 32,500 good / 54,000 possible = 60.2%.

Availability is the weak factor. Its three largest rows, the sesame clean, waiting for batch and the flavour changes, are set by the kitchen and the production sequence, not by the filler's mechanics.

The performance gap, 3,900 tubs, equals 65 minutes at rated speed. On this line it comes from tub denester misfeeds, short lid misses and running slow while the hold tank level is low.

Pricing the day: minutes, rejects and grams

Stop minutes are priced at the crew cost of a line minute, EUR 8.25. Rejects are priced at the material lost, because on this line no filled tub goes back into a batch, so nothing is recovered.

One rejected tub costs EUR 0.57: 200 g of hummus at EUR 2.40 a kg (sample figure) plus EUR 0.09 for tub, film, lid and label (sample figure). Month = 21 production days, year = 252.

LossEUR a dayEUR a monthEUR a year
Rejects, 1,100 tubs627.0013,167158,004
Sesame clean, 75 min618.7512,993.75155,925
Slow running, 65 min536.2511,261.25135,135
Waiting for batch, 64 min528.0011,088133,056
Flavour changes, 54 min445.509,355.50112,266
Giveaway, 162.5 kg390.008,19098,280
Blocked by vessel, 46 min379.507,969.5095,634
Lidder and coder, 36 min297.006,23774,844
Total3,822.0080,262963,144
Daily loss, EUR (example) Rejects, 1,100 tubs 627.00 Sesame clean, 75 min 618.75 Slow running, 65 min 536.25 Waiting for batch, 64 min 528.00 Flavour changes, 54 min 445.50 Giveaway, 162.5 kg 390.00 Blocked by vessel, 46 min 379.50 Lidder and coder, 36 min 297.00 Total EUR 3,822 a day
The example line's day, priced. Red: rejects. Amber: stop minutes at EUR 8.25. Light amber: slow running. Grey: giveaway, which OEE does not show.

Per shift, the total is EUR 1,911. At crew cost, the ranking changes the meeting agenda: rejects and one unplanned clean each cost more than all the kitchen waits, and giveaway, which OEE does not show, outranks the vessel.

If orders are waiting, a lost minute also costs margin. At a sample contribution margin of EUR 0.35 a tub, one filler minute is worth 60 x 0.35 = EUR 21.00, against EUR 8.25 of crew cost.

At that rate the order changes: the sesame clean (75 x 21.00 = EUR 1,575.00) goes to the top, the kitchen waits (EUR 1,344.00) pass the rejects, and the vessel (EUR 966.00) passes giveaway.

Use the margin view only when the line is sold out and the lost tubs could have been shipped inside their dates. Otherwise the crew cost is the safer floor for the business case.

Fill weight in a thickening batch

Germany's prepackage rules (Fertigpackungsverordnung, section 9) set two limits that matter here. The mean fill of a lot must not fall below the nominal quantity, and the tolerable negative error for a 200 g pack is 9 g.

At most 2% of packs may fall short by more than 9 g. The mean is the tighter limit: a plant that keeps every tub above 191 g but runs a mean of 199 g still fails. So fill targets sit above 200 g, and the question is how far.

A piston filler doses a volume. When the paste in the hold tank cools, sits or takes up air, the weight in each stroke shifts. Without a view of the drift by batch, the safe answer is a wide margin. In the example the mean is 205 g.

  • Giveaway: 5 g x 32,500 good tubs = 162.5 kg a day.
  • Priced: 162.5 x EUR 2.40 = EUR 390.00 a day, EUR 98,280 a year.
  • Kitchen output: a 500 kg batch fills 2,500 tubs at 200 g but 2,439 at 205 g, 61 tubs fewer.
  • Tightened to a 202 g mean: 3 g x 32,500 = 97.5 kg saved, EUR 234.00 a day, EUR 58,968 a year.

Giveaway is not an OEE loss, because the tubs are good. It belongs next to the quality rate on the same daily report. The measuring method is covered in giveaway and overfill as a quality loss.

The floor test is short. Weigh 10 tubs an hour and write the batch number and the batch's minutes in the hold tank next to the mean. If weight climbs with batch age, the fix is in hold time and tank handling, not in the filler.

Sesame cleans and flavour changes: sequence first

"Sesame seeds and products thereof" are on the allergen list in Annex II of Regulation (EU) No 1169/2011. Classic hummus contains tahini, which is sesame paste, so a sesame-free dip on a shared line needs a clean before it runs.

The European Commission's 2022 notice on food safety management systems suggests controlling cross-contact through production order, including running the products with the most allergens at the end of the day.

The same notice calls validation or verification of the cleaning method relevant where a visual check is not possible. That verification time belongs inside the clean's standard, not in a separate unlogged gap.

On a hummus line, that means the sesame-free dip runs first, right after the overnight full clean, and the sesame products follow. In the example a late order broke that sequence, and one mid-day clean cost 75 minutes and EUR 618.75.

ChangeClean (plant rule)Sample standardWhat to log
Classic to flavoured hummusPush-out and rinse15 minMinutes over, push-out tubs
Flavoured to classicPush-out, hopper and nozzle rinse15 minMinutes over, push-out tubs
Sesame product to sesame-free dipFull allergen clean, verified75 minClean minutes, check result
Sesame-free dip to sesame productPush-out and rinse15 minMinutes over, push-out tubs

In the example the three flavour changes took 54 minutes against a 45-minute standard, 9 minutes over. The 300 push-out tubs cost more: 300 x EUR 0.57 = EUR 171.00 a day, already inside the rejects row.

Short chilled life drives short runs. In a peer-reviewed study in Heliyon, untreated hummus kept 14 days at 4 °C, and hummus treated at 350 MPa for 2-5 minutes kept 28 days, under lab conditions.

With dates that short, the example plant runs four recipes in one day, with three flavour changes and one sesame clean. Track changeover time against a standard for each change type, and plan the week so the sesame-free runs sit at the start of a day.

Hummus line downtime: a failure-mode table

SymptomLikely causeFloor checkOwner
Filler waits after each batchBatch cycle slower than fillerTime 5 batches, blend start to releaseKitchen lead
Wait after a QA holdTexture or taste out, re-blendLog ready time vs release timeQA
Weight climbs late in a batchPaste thickens in the hold tank10 tubs an hour with batch ageProcess engineer
Filler stops, rack fullVessel pace below fillerTubs per load, time 5 cyclesHPP lead
Leakers after HPPSeal or film not suited to compressionPeel test before and after pressingPackaging
Lid misses, film wrinklesTub stack or film tensionMisfeeds per 1,000 tubsMaintenance
Faint or missing codesInk, head or wet tub surfaceRead 20 codes after each startMaintenance
Long gap after flavour changePush-out and rinse not standardTime against the change standardShift lead

Only one row, the flavour change, is a filler task. The rest start in the kitchen, the hold tank, the vessel, the lidder or the coder, which is why the filler's own maintenance log cannot explain a weak availability figure on its own.

Leakers after pressing deserve their own check. The Food Science and Biotechnology review notes that cans and glass bottles tend to fracture or deform under HPP, so tubs, films and seals must be specified for the pressure step, not just for the chiller.

Decision: sheet, filler counter or line software for a dips line

The losses above only move if they are counted the same way on every shift. Four options, from cheapest to fullest:

OptionWhat it givesCostFits
Paper shift sheetStops and counts by hand, weekly OEETeam leader 15 min a shift, about EUR 12.38One line, first month
Filler counter plus spreadsheetMachine count, typed reasonsEngineer days; ask the integratorOne line, engineer free
Line software on the filler signal (OEE or light MES)Live counts, stops by reason, priced lossesVendor quote, set against the priced day aboveSeveral lines, daily review
Full MESOrders, recipes, batch recordsQuote per siteGroups with an MES plan

Line software reads the filler's signal through the line PLC or an added device, so micro-stops and run time are counted, not estimated. The operator still names each stop. For a buyer's view of the category, see OEE software for food and beverage.

What you see: a shift timeline, unclassified time waiting for a reason, and the operator's line-down screen, on sample lines. Book a demo.
Plays from YouTube. Google may set cookies when you press play. Privacy policy.

A light MES adds work around the counts: hourly targets, changeover standards and scrap by reason, without the recipe and batch-record scope of a full system. When recipes and batch records must sit in one system, read MES for food manufacturing first.

  • One line, no budget yet: paper for ten production days, to prove the reason list.
  • One line, an engineer available: filler counter and spreadsheet, if one person owns it every week.
  • Several tub lines or three crews: line software, so every crew reads the same numbers.
  • A group with recipe and batch-record needs: full MES, with OEE as one module.

Questions to ask a vendor before a trial:

  1. Which signal counts tubs on this filler, and does that differ between a rotary and an inline filler?
  2. Can "waiting for batch" and "blocked by vessel" be separate reasons in the operator's list?
  3. Can each change type, flavour or sesame clean, have its own standard time?
  4. How are leakers found after HPP entered, and against which day?
  5. Can each tub format carry its own selling price and margin, so a lost minute and a reject show in euros?
  6. What does a quote cover: per line, per machine or per site?

Ten days of counts at the tub filler

Start with one line and one count point. The card below is the floor routine for the first ten production days, before any tool decision.

Floor card: six steps to count a hummus tub line, from the three paces to pricing the day
A ten-day floor card for a chilled tub line with a batch kitchen and an HPP vessel.
Text version of the diagram
  1. Write the three paces: kitchen kg per hour as tubs a minute, filler rated tubs a minute, vessel tubs per load x cycles / 60.
  2. Count at the filler: one count point for tubs out, rejects counted at the checkweigher, good tubs = filled minus rejects.
  3. Name every stop: waiting for batch, blocked by vessel, flavour change, allergen clean, lidder, coder, one list for all crews.
  4. Weigh 10 tubs an hour: write mean and spread per batch, note batch age in the hold tank, price grams over 200 g at kg value.
  5. Log every vessel load: tubs in the basket against a full load, cycles per hour by shift, part loads flagged at flavour ends.
  6. Price the day, fix the top row: minutes x crew cost, rejects x material, rank by euros, one fix a week, then re-measure.

By day ten the line has a priced loss table like the one above, with its own numbers. Pick the top row, fix one thing, and re-measure for a week before touching the next.

Where Fabrico fits

Fabrico is made by the publisher of this article. It is OEE software and a light MES with computer vision. On a tub line like the one above:

  • OEE by line and shift from the core machine, here the tub filler, connected through the line PLC or a Fabrico IoT device.
  • The operator chooses stop reasons at the machine in a few taps; "waiting for batch" and "blocked by vessel" are set up in the reason list.
  • Changeovers are tracked against a standard time, with planned and unplanned stops kept apart.
  • Scrap is recorded by product and reason. With each product's selling price and margin entered, losses are priced in money and stops are ranked by financial impact.
  • A line screen shows actual against target hour by hour. Where a camera covers the line it counts output, for example at a case packer with no usable signal.
  • HPP pressure and hold-time records stay in the vessel's own control system.

See the OEE and MES solution overview and the pricing page: one quote per plant, by machines and modules.

Sources, accessed 27.11.2026: Eurostat, Labour cost levels by NACE Rev. 2 activity (lc_lci_lev); EUR-Lex, Regulation (EU) No 1169/2011, Annex II; EUR-Lex, Commission Notice 2022/C 355/01 on food safety management systems; EUR-Lex, Regulation (EC) No 2073/2005, Annex I; Federal Ministry of Justice, Fertigpackungsverordnung section 9; Osaili et al. (2025), High pressure processing of hummus, Heliyon, doi 10.1016/j.heliyon.2025.e42590; Sehrawat et al. (2020), Microbial inactivation by high pressure processing, Food Science and Biotechnology, doi 10.1007/s10068-020-00831-6; IFT Food Technology (2021), HPP batch and bulk capabilities; NDSU Extension, Chickpeas and More! (FN1739).

Frequently asked questions

Is there a benchmark OEE for a hummus production line?

No published benchmark for chilled dips lines was found for this page. Measure the line's own baseline at the filler for two weeks, then track the change. Compare lines only when they count at the same point.

Should the HPP vessel have its own OEE?

It can, as a separate batch machine measured in loads and cycles. For the line figure, keep one count point at the filler and log "blocked by vessel" as a reason, so the vessel's effect shows without double counting.

Is waiting for a batch an availability loss or a planned stop?

An unplanned availability loss. The kitchen was planned to supply the filler; when it does not, the filler stops. Booking it as planned hides 64 of the example's 275 stop minutes, its second-largest row.

Does giveaway lower OEE?

No. Overfilled tubs are good tubs, so the quality rate does not change. Price giveaway separately, next to OEE, in kilos and euros a day.

When should the sesame-free product run?

First in the day, after the full end-of-day clean, with sesame products after it. The European Commission's 2022 notice suggests running the products with the most allergens at the end of the day on shared lines.

Does HPP remove the Listeria risk from hummus?

Not on its own. In the Heliyon study, 350 MPa for 5 minutes cut Listeria monocytogenes by about 1 log cfu/g. The EU criteria in Regulation (EC) No 2073/2005 for ready-to-eat foods able to support its growth still apply.

Which loss should a dips plant fix first?

The top row of the priced loss table, in the pricing view that fits the line. In the example, rejects lead at crew cost and the sesame clean leads at margin; in both views the sesame clean costs more than all the kitchen waits.

See where a tub line loses its minutes. A demo shows OEE by line and shift from the core machine, stop reasons chosen by the operator, and losses priced in euros.

Book a demo

Track OEE and downtime in real time
See where lines lose time
Book a live demo.
See where lines lose time
See where lines lose time

Real Fabrico tiles, sample data.

By clicking the Accept button, you are giving your consent to the use of cookies when accessing this website and utilizing our services. To learn more about how cookies are used and managed, please refer to our Privacy Policy and Cookies Declaration