OEE for glass jar lines: lyutenitsa, pickles and jam
In short
- A glass jar line loses time in five places: broken glass, the capper, caps without vacuum, fill level and the changeover to another product.
- One broken jar costs more than the stop. The line stops, the area is cleaned and checked, and the jars around it go to rejects.
- In the example below each glass incident costs 360.80 EUR, and the three in the shift cost more than all the capper jams together.
- The season is a loss of its own: the changeover from lyutenitsa to roasted peppers is the most expensive item in the example.
OEE on a glass jar line measures how much of the planned time the line turns into good jars: filled, capped, pasteurised and labelled. The time goes to broken glass, capper jams and stops, caps without vacuum, jars filled too low or too high, and the changeover from one product to the next, which in season happens every week.
This article is for owners, production managers and food technologists in plants that make lyutenitsa, pickles, preserves, jams and other vegetable and fruit products in glass jars. It shows where the time goes on such a line, what one broken jar costs in full, how to count caps without vacuum, and a worked example of one shift in euros.
The seasonal jar plant in Bulgaria
Fruit and vegetable processing is a large sector of small and mid-sized plants. According to Eurostat structural business statistics, in 2024 Bulgaria had 331 enterprises in other processing and preserving of fruit and vegetables, with 6,692 people employed (accessed 26.11.2026). That is about 20 people per enterprise on average.
A plant like this is strongly seasonal. In autumn the line fills lyutenitsa and roasted peppers, in winter pickles and preserves. Every change of season is a change of product, jar and cap. That makes changeover and line preparation matter more than in a plant that runs one product all year.
The machines on a jar line and how they stop
| Machine | Stops and losses | How they are recorded |
|---|---|---|
| Depalletiser and rinser | Fallen jar, broken glass at the infeed | Downtime, "starved (waiting for product)" at the filler |
| Filler | Nozzle blocked by pieces, low or high fill | Downtime and rejects |
| Capper | Crooked cap, empty cap chute, jar broken during capping | Downtime and short stops |
| Pasteuriser | Full infeed, temperature out of range | "Blocked" at the filler |
| Vacuum detector | Rejects caps without vacuum | Rejects |
| Labelling and packing | Crooked label, short jams | Short stops and rejects |
On a linked line, OEE is read at the core machine. On a jar line that is the filler, which sets the pace. Stops on the other machines are recorded as reasons against it. Availability, performance and quality follow the definitions in ISO 22400-2 (accessed 26.11.2026).
Newer machines can report their state using the PackML state model (ISA-TR88.00.02, accessed 26.11.2026). In that model "Held" is a stop for the machine's own problem, and "Suspended" is waiting for something outside, for example an empty infeed or a full pasteuriser. The difference shows whose loss it is.
Broken glass: an incident, not a stop
When a jar breaks in the capper, the line cannot simply carry on. A piece of glass may have landed in the jars next to it.
A glass procedure runs like this: the line stops, the area is cleaned, the machine is checked for fragments, and the jars in a set zone around the break go to rejects. Only then does the line start again.
So broken glass costs three things:
- The minutes of the stop: 12 minutes in the example below, against 3 for a capper jam.
- The jars rejected around the point of the incident.
- The time of the people who clean and check instead of running the line.
If a glass incident is recorded as "capper downtime", it gets lost among dozens of short stops. Give it its own reason and also record the number of jars discarded. Then you can see what one incident costs and what all of them cost in a month.
The glass procedure is part of the food safety system. Article 5 of Regulation (EC) 852/2004 requires food business operators to have procedures based on HACCP principles (accessed 26.11.2026). OEE data does not replace the HACCP records, but it shows what each incident costs and whether their number is falling.
Caps without vacuum and fill level
A capped jar is not automatically a good jar. Two checks decide that.
Vacuum. With hot filling and steam capping, the cap has to pull a vacuum. The detector after the capper rejects jars without vacuum. The causes to check first are low product temperature, a crooked cap and product on the rim of the neck.
Level and weight. A jar filled too low is rejected by the checkweigher. Under Directive 76/211/EEC on prepackaged products (consolidated text of 11.04.2009, accessed 26.11.2026), the average content may not be below the nominal quantity, and for a pack of 200 to 300 g the tolerable negative error is 9 g. For a 260 g jar that is 9 g.
The lot. Directive 2011/91/EU requires a lot marking on food, with the exemptions in Article 2; under Article 5 it is not needed when the label shows a best-before or use-by date with at least the day and month (accessed 26.11.2026). Without a readable lot or date code the jar cannot be traced, and Article 18 of Regulation (EC) 178/2002 requires the producer to know who it supplied the food to (accessed 26.11.2026).
Count rejected jars where they leave the line: at the vacuum detector and at the checkweigher. They count in the quality part of OEE.
The pasteuriser: the buffer that stops the filler
The tunnel pasteuriser after the capper holds the jars for a set time at a set temperature. It cannot speed up to catch up.
If labelling after it stops, the pasteuriser fills up and then blocks the capper and the filler. At the filler this shows as "blocked", but the cause is two machines further down.
So "blocked" needs a sub-reason: which machine after the filler stopped first. Without it, the filler crew explains minutes it did not cause, and labelling looks as if it never stops. How to assign such minutes to the right machine is covered in the article OEE for a case packer.
The seasonal changeover
A changeover on a jar line is more than a product change. It includes:
- Washing the filler and pipes clear of the old product, especially if it is hot or contains allergens.
- Changing format parts if the jar is a different size.
- Changing the caps in the chute and setting the capper.
- A new label and a check of the lot code.
- Running up to the first good jar: temperature, level, vacuum.
Set a standard time for each pair of products and record the difference. In season the same changeover repeats dozens of times, and every minute saved is multiplied.
The cheapest improvement is in the plan. Group orders by product and jar size so the line runs longer batches. More on changeover sequence is in the article OEE on a high-mix food line.
Example: one shift on a lyutenitsa line
The numbers are an example, not a customer's. 260 g jars, an ideal filler rate of 120 jars per minute, 450 minutes of planned time, so the ideal for the shift is 54,000 jars. The stop threshold is 2 minutes. Midway through the shift the line changes from lyutenitsa to roasted peppers.
The contribution in the example is 0.22 EUR per jar, a deliberately modest number: Aswath Damodaran's data (NYU Stern) gives a gross margin of 23.23 % for US-listed food processing companies (data as of January 2026, accessed 26.11.2026). Replace it with your own.
| Cause | Stops | Minutes | Recorded as | Jars | EUR per shift |
|---|---|---|---|---|---|
| Changeover to roasted peppers | 1 × 45 min | 45 | downtime | 5,400 | 1,188.00 |
| Broken glass, procedure | 3 × 12 min | 36 | downtime | 4,320 | 950.40 |
| Jars rejected around the glass | 3 × 200 | quality | 600 | 132.00 | |
| Capper jams | 10 × 3 min | 30 | downtime | 3,600 | 792.00 |
| Labelling short stops | 40 × 30 s | 20 | speed loss | 2,400 | 528.00 |
| Caps without vacuum | 800 jars | quality | 800 | 176.00 | |
| Low fill, rejected by the checkweigher | 400 jars | quality | 400 | 88.00 | |
| Total | 131 | 17,520 | 3,854.40 |
How the numbers are reached:
- Downtime: 45 + 36 + 30 = 111 minutes, run time 339 minutes. Availability: 339 / 450 = 75.3 %.
- In 339 minutes the ideal is 40,680 jars. Short stops cost 2,400. Output was 38,280. Performance: 38,280 / 40,680 = 94.1 %.
- Rejects: 600 + 800 + 400 = 1,800, good jars 36,480. Quality: 36,480 / 38,280 = 95.3 %.
- OEE: 75.3 % × 94.1 % × 95.3 % = 67.6 %. Check: 36,480 / 54,000 = 67.6 %.
- One minute of the line is worth 120 × 0.22 = 26.40 EUR. The loss: 17,520 jars × 0.22 EUR = 3,854.40 EUR per shift.
- One glass incident: 12 minutes (316.80 EUR) plus 200 jars (44.00 EUR) = 360.80 EUR.
Sorted by number of stops, labelling short stops come first: 40 of them. Sorted by money, the changeover comes first, and right after it the three glass incidents: 1,082.40 EUR, more than the ten capper jams.
The first task is about glass: where the jars break and why. Check the capper infeed and the depalletiser first, for pressure between jars or impact on the guides. The second task is about the plan: longer runs in season.
If three incidents per shift are typical for your line, at 500 shifts a year (two shifts, 250 days) glass costs 541,200 EUR. At one incident per shift the figure is 180,400 EUR. The money is real only if the line sells everything it makes. Check it separately for the season and for the rest of the year. Agree the rule with finance.
The morning meeting in season
In season there is no time for long meetings. The board shows yesterday's figures: OEE at the filler, the number of glass incidents, vacuum rejects and changeover minutes against the standard.
If glass incidents are up on yesterday, first check the point where the jars break. If vacuum rejects are rising, first measure the product temperature at filling. Each figure has one check and one name next to it.
Who owns each loss
| Loss | Owner | Data they need |
|---|---|---|
| Broken glass | The technologist and the technician | Incidents by machine and hour, jars discarded |
| Capper | The technician | Stops by reason and by cap type |
| Caps without vacuum | The technologist | Rejects by hour, compared with product temperature |
| Fill level | Quality | Average weight and checkweigher rejects per shift |
| Changeover | Planning | Minutes against standard per product pair |
Mistakes when starting out
| Mistake | What you see later | How to avoid it |
|---|---|---|
| Glass is logged as "machine downtime" | Incidents get lost among short stops | Its own reason and a count of jars discarded |
| One ideal rate for all jars | Performance of the large jar looks poor | Ideal rate per product and size |
| Rejects counted at the end of the shift | Nobody knows which hour they came from | Live rejects from the detector and the checkweigher |
| Changeover without a standard | Each one takes a different time and nobody knows why | A standard for each pair of products |
Manual case packing
Where jars are packed into cases by hand after labelling, there is no machine and no signal, and the count is written down at the end of the shift.
A camera above the packing table counts the cases that leave. A pause in the count is a stop, and the gap between jars from labelling and cases times jars per case shows the losses at that station.
The camera does not identify the reason for the stop and does not monitor people. Point the camera at the cases, not at the walkways, and report by line and shift. How to choose between a camera and a sensor for each machine is covered in the article camera or sensor for OEE by machine.
Paper, spreadsheet or software for a seasonal plant
For a small seasonal plant the first step is not a big system. More on the choice is in the article OEE software for small manufacturers.
| Method | Fits when | What it misses |
|---|---|---|
| Paper log | One product, short season | Short stops and the cost of glass |
| PLC counter into a spreadsheet | A first estimate of OEE | Reasons and rejects |
| OEE software with a PLC signal and operator reasons | Many products in season | Stations without a signal |
| The same plus a camera on manual packing | Hand packing into cases | Almost nothing |
Questions for the supplier:
- Which machine is OEE read from on a linked line?
- Can a glass incident be its own reason, with a count of jars discarded?
- How do vacuum detector rejects enter quality?
- How is the ideal rate set per product and jar size?
- How is a changeover recorded against a standard?
- What happens to the data if the plant network drops?
How to start

Text version of the diagram
- Read OEE from the filler.
- Give broken glass its own reason and count the jars discarded.
- Count vacuum rejects and level rejects separately.
- Set a standard for each changeover.
- Rank the losses by money.
Fabrico provides the measured rates per line; the plan itself is made in the ERP, the APS or the planning spreadsheet.
This week: count the glass incidents for one week and the jars discarded in each; time two changeovers; work out what one minute of the filler is worth.
This quarter: a PLC signal from the filler and the capper, with reasons from the operator; a standard for each changeover in the season; the first task on the point where jars break. For food in metal cans, see the article OEE for food canning lines.
Where Fabrico fits
Fabrico is made by the publisher of this article.
- What it is: an OEE platform and light MES with built-in maintenance management. It shows live OEE by line and shift.
- Linked line: OEE is read at the core machine, and starved (waiting for product) and blocked time are recorded as stop reasons.
- Data: machines connect through the line PLC or through a Fabrico IoT device; where there is no signal, a camera counts output.
- Reasons: stops above the threshold get a reason in a few taps, and stops under the set threshold (up to 10 minutes) go into speed loss. The camera does not identify the reason.
- Money: with the Financial Impact module every loss has a price in EUR.
- Video: where a camera covers the line, the video for the minute of a stop opens from the shift timeline, is streamed on request and not stored in Fabrico.
- Hosting and security: EU customers are hosted on AWS in Frankfurt. Certified to ISO/IEC 27001, ISO/IEC 20000-1 and ISO 9001. The gateway keeps data for up to 30 days if the network drops.
- Price: one quote per plant, based on machines and modules (pricing).
For food plants, see also the article MES for food manufacturing, and for the machine after the filler OEE for a case packer.
A result from a Bulgarian plant
At Ficosota, a maker of home care, hygiene and consumer goods, not food, the time without a recorded stop reason fell from 3.20 % to 0.40 % between June and September 2026. That is across 16 lines with OEE and the Financial Impact module, and OEE rose from 53.11 % to 59.62 %. The figures are approved by the customer.
Ficosota is also an investor in Fabrico (since January 2025) and an industrial partner in developing the OEE module; keep that in mind when reading the results.
See a jar line in Fabrico. In a demo you will see the line's stops by reason and what each one costs in euros.
Frequently asked questions
Which machine is OEE read from on a jar line?
From the filler, which sets the pace. Stops on the capper, the pasteuriser and labelling are recorded as reasons against it.
How is broken glass recorded in OEE?
As its own stop reason, with the number of jars discarded counted as rejects. That way you see the cost of each incident, not just the minutes.
Is a cap without vacuum a reject?
Yes. The jar was made, but it is not good. Count the jars rejected by the detector in the quality part of OEE.
How underfilled can a 260 g jar be?
Under Directive 76/211/EEC the tolerable negative error for packs of 200 to 300 g is 9 g, and the batch average may not be below the nominal quantity.
Does a planned seasonal changeover count against OEE?
Yes. It stays inside planned time and lowers availability. Set a standard for each pair of products and record the difference against it.
Why is the filler "blocked" when nothing has stopped in front of it?
Because a machine after it has stopped, for example labelling, and the pasteuriser has filled up. Record "blocked" with a sub-reason for the machine that stopped first.
Does a jar line need a camera?
Not for machines with a PLC. A camera makes sense at manual case packing or on an old machine without an accessible signal, where it counts output.
Latest from our blog