Frozen pastry line OEE: banitsa, filo, puff pastry, croissants

Frozen pastry line OEE: banitsa, filo, puff pastry, croissants

How to measure OEE on a frozen pastry or laminated dough line: 6 stations, a loss map per product and a worked example worth 59,700 EUR a year.
Frozen pastry line OEE: banitsa, filo, puff pastry, croissants

In short

  • One machine sets the pace: on a banitsa, filo, puff pastry or croissant line it is usually the freezer or the make-up line. That is where the ideal rate comes from.
  • Count at two points: after make-up and after packing. Where a machine has no usable signal, a camera does the counting.
  • Five losses carry most of the minutes: waiting for rested dough, sheet breaks, depositor stops, filling changeovers and start-up scrap.
  • Run fillings in order: gluten only first (plain filo), then cheese, then spinach and cheese, with nuts and sesame last or after a clean.
  • In the example: a changeover 10 minutes shorter, twice a shift, is worth about 59,700 EUR a year, if the gain holds.

OEE on a frozen pastry line is measured at the station that sets the pace, usually the freezer or the make-up line. You count good packs after packing, give every stop a reason, and calculate availability, performance and quality for each shift on its own.

To raise OEE, you work on the biggest loss. On banitsa it is often the changeover between fillings. On puff pastry it is the rest time between folds. On filo it is sheet breaks. This guide shows where the minutes sit on a laminated dough line and what they are worth in EUR.

The line in 6 stations, and which one sets the pace

Banitsa, filo, puff pastry and croissant lines look different on the floor, but they follow the same logic. The dough passes six stations. Each has a typical loss and its own data source.

StationTypical lossWhat to logSignal source
1. MixerBatch late, line waits for doughStart and end of each batchMixer PLC or an IoT device
2. Dough restDough not ready, make-up stands idleRest start and end per batchManual entry or timer, rarely a signal
3. Sheeter and laminatorSheet breaks, start-up scrapStops with a reason, scrap in kgLine PLC
4. Make-up: depositor, rolling, cuttingDepositor stops, micro-stops, misshapen piecesPieces made, stopsCamera, where there is no usable signal
5. Proofer and freezerGaps on the belt, evaporator defrostBelt loading, stopsFreezer PLC
6. Packing and case packingFilm changes, jamsGood packs, stopsPacker PLC

The slowest station sets the pace of the whole line. On frozen products that is rarely the mixer. It is nearly always the freezer, because every piece has to stay inside for a set time. Sometimes it is the make-up line, when the depositor or the rolling unit cannot keep up with the freezer.

So the ideal rate comes from the pacing station, not from the nameplate of the fastest machine. Take it from the flow wrapper and performance will look poor every day. The problem then lies in the number you chose, not in the line.

One detail ruins a lot of reports. When make-up stops for 10 minutes, the freezer keeps discharging product for as long as its dwell time. Packing sees the gap later. If you log the stop only at packing, the reason lands on the wrong station.

The fix is simple: count at two points. The first is after make-up, before the freezer. The second is after packing. The difference between the two counters shows scrap and losses in the freezer and at packing. The freezer's own losses are covered in the guide to OEE for frozen food production.

On many make-up lines the depositor and cutter have no output that gives a count. There, camera-based production counting over the belt solves it without touching the machine. The camera counts pieces; the stop reason stays with the operator.

The line in 6 stations1. Mixer2. Dough rest3. Sheeter and laminator4. Make-up and fillinga camera counts pieces5. Freezersets the pace6. Packing and casesCounter 1: after station 4Counter 2: after station 6
The freezer usually sets the pace. Count at two points: after make-up and after packing.
Track OEE and downtime in real time
Book a demo

A loss map per product family

The same line loses time in different ways depending on the product. A single OEE target for the whole plant hides more than it shows. The map below gives the top three losses for each family. Use it as a starting list of stop reasons, not as a norm.

ProductLoss 1Loss 2Loss 3
BanitsaFilling depositor stops (cheese lumps, clogging)Changeovers between fillings, incl. allergen cleansFilo tearing during rolling and laying
Filo sheetsBreaks in the thin sheet during stretchingStart-up scrap until thickness settlesSticking at stacking, trim at cutting
Puff pastryWaiting on rest time between foldsFat breaking through, torn layers at the laminatorEdge trim fed back into the dough
Croissants and kifliMisshapen pieces at cutting and curlingProofer and freezer capping the paceChangeovers by size and filling (chocolate, nuts)

Two losses on the map often vanish from reports. The first is waiting for dough. Nothing is broken; there is simply nothing to make up. If the operator picks no reason, those minutes become "unknown" and nobody chases them.

The second is trim fed back into the dough. It never reaches the scrap bin, so it looks free. In OEE terms it is a quality loss: the material went through the line without becoming a good pack first time. Log it in kg by product.

How to use the map

  • Build your stop reason list from the three losses of the product that runs the most hours.
  • Add "waiting for dough" and "allergen clean" as reasons of their own, not under "other".
  • After two weeks, hold the map against your data. Where they disagree, trust the data.

A sequence rule for fillings

The changeover between fillings is the main availability loss on banitsa. Part of it is the change itself: emptying the depositor, loading the new filling, the first pieces. The other part is cleaning, when the next product must not contain the previous one's allergen.

Regulation (EU) No 1169/2011 lists 14 groups of substances causing allergies in Annex II. On pastry lines the usual ones are cereals containing gluten, eggs, milk, nuts and sesame. Wheat is in every dough, so the difference between products comes from the filling and the topping.

The rule is simple: run fillings from fewer allergens to more. Each next batch may carry the previous batch's allergens without a full clean. Going the other way needs a clean.

  1. Plain filo sheets: gluten only.
  2. Cheese banitsa: adds milk and eggs.
  3. Spinach and cheese banitsa: same allergens; only the product changes.
  4. Pumpkin and walnut pastry, or a sesame topping: at the end of the day, or after a full clean.

Here is what the order costs in time. Say a filling change without a clean takes 15 minutes and a full clean takes 40. The numbers are an example.

  • Wrong order: pumpkin and walnut, then filo (clean 40), cheese (15), filo again (clean 40), spinach (15). Total 110 minutes.
  • Right order: filo, cheese (15), spinach (15), pumpkin and walnut (15). Total 45 minutes.
  • Difference: 65 minutes of production time a day, without a single new machine.

Whether two batches need a clean between them is for your HACCP plan to decide, not the rule. If the walnut pastry is labelled milk-free, it needs a clean before it too. Then the right order costs 70 minutes, still 40 fewer than the wrong one. Building that table is covered in the guide to the allergen changeover matrix.

The link to OEE is direct. Every unnecessary clean is lost availability. When the shift plan is made in the ERP or a spreadsheet, the sequence rule belongs there, not only in the shift leader's head.

Worked example: OEE of a banitsa line in EUR

The example is one line making frozen cheese banitsa in packs of 6 pieces. The numbers are an example, not a customer's. Every step can be checked with a calculator.

ItemValueHow you get it
Ideal rate20 packs/min (1,200 an hour)Freezer capacity: 120 pieces/min divided by 6
Shift480 min8 hours
Planned stops30 minBreaks
Planned production time450 min480 - 30
Downtime90 min2 changeovers of 25 min, 25 min depositor and sheet breaks, 15 min freezer
Run time360 min450 - 90
Total packs6,120Counter after packing
Scrap306 packsStart-up, misshapen, underweight
Good packs5,8146,120 - 306

The three factors

  • Availability: 360 / 450 = 80.0%.
  • Performance: 6,120 / (360 × 20) = 6,120 / 7,200 = 85.0%.
  • Quality: 5,814 / 6,120 = 95.0%.
  • OEE: 0.80 × 0.85 × 0.95 = 64.6%.

A second way to check: at 100% for 450 minutes the line would make 450 × 20 = 9,000 good packs. It makes 5,814. 5,814 / 9,000 = 64.6%. Both routes give the same figure, so the sum holds.

What the gap is worth

The example uses a contribution of 0.35 EUR per pack, after ingredients and packaging material. Put your own figure in its place.

  • Good packs not made per shift: 9,000 - 5,814 = 3,186.
  • Per shift: 3,186 × 0.35 = 1,115.10 EUR.
  • Per month (2 shifts × 22 days = 44 shifts): 1,115.10 × 44 = 49,064.40 EUR.
  • Per year (12 months): 49,064.40 × 12 = 588,772.80 EUR.

This is the distance to the theoretical maximum, not money you can collect in full. No line runs at 100%. The figure shows the order of magnitude and ranks the losses by value.

What a shorter changeover is worth

Suppose the changeover drops from 25 to 15 minutes. With two changeovers a shift, that is 20 more minutes of run time.

  • Extra packs: 20 min × 20 = 400 at full rate.
  • After performance and quality: 400 × 0.85 × 0.95 = 323 good packs.
  • Per shift: 323 × 0.35 = 113.05 EUR.
  • Per month: 113.05 × 44 = 4,974.20 EUR.
  • Per year: 4,974.20 × 12 = 59,690.40 EUR.

The new OEE in this example: run time 380 minutes, availability 380 / 450 = 84.4%, good packs 5,814 + 323 = 6,137, OEE 6,137 / 9,000 = 68.2%. In this example that is about 59,700 EUR a year, if the gain holds and the market takes the extra packs.

Watch one trap: if the freezer is the pacing station, minutes won at make-up only turn into packs when the freezer had empty space on its belt. Check its loading before you count the money.

The freezer and the cold chain

A freezer is an odd machine. It does not run on strokes per minute; it runs on time. Every piece must stay inside until its core reaches the required temperature. That dwell time caps the speed of the whole line.

The sum is one line: maximum rate = pieces that fit on the belt / dwell time in the freezer. In the example the belt holds 4,320 pieces and cheese banitsa needs 36 minutes. 4,320 / 36 = 120 pieces a minute, or 20 packs of 6.

If the spinach banitsa is thicker and needs 45 minutes, the cap drops to 4,320 / 45 = 96 pieces a minute, or 16 packs. So the ideal rate has to differ by product. With one rate for everything, the heavier products will always look slow on performance.

What the law says about -18 °C

Council Directive 89/108/EEC on quick-frozen foodstuffs, as Article 1 reads, defines them as foods that have undergone suitable quick-freezing, after which the temperature is -18 °C or lower at all points in the product. Article 5 allows brief rises of no more than 3 °C during transport.

The Codex Alimentarius has a separate code of practice for quick frozen foods, CXC 8-1976. Its proposed draft revision treats quick freezing as complete only once the thermal centre reaches -18 °C after thermal stabilisation.

For the line, that means one thing: freezer speed is not raised to chase OEE. If pieces leave with a warmer core, the rule is broken, whatever the counter says.

Temperature records are not an OEE input

Commission Regulation (EC) No 37/2005, as Article 2 reads, requires instruments that record air temperature during the transport, warehousing and storage of quick-frozen foods. Records are kept for at least one year.

These records serve safety, not efficiency. The reporting rule is this:

  • A temperature deviation triggers a hold on the batch for review.
  • Held packs stay out of the good count until they are released.
  • If the batch goes to scrap or rework, its packs count as a quality loss.
  • The deviation itself is logged as a stop with a reason, if the line stopped.

Regulation (EC) No 852/2004 adds one more duty: the cold chain is not to be interrupted, as Annex II, Chapter IX reads. Short periods outside temperature control are allowed for practical handling, where they do not put health at risk.

Why fast freezing protects quality

The freezer's pace has a product side too. A study on frozen croissant dough by Ban and co-authors (LWT, 2016) compared freezing rates from -0.72 to -3.56 °C per minute. At -3.19 °C per minute or faster, ice crystals were smaller and croissant quality was better.

The same study found that a terminal temperature below -20 °C caused more yeast death. For sweet dough, Akbarian and co-authors (2016) showed that slow freezing and longer storage hurt texture. The lesson for OEE: scrap from customer claims often starts in the freezer, not at packing.

Changeovers and cleaning

On banitsa and croissants, the changeover is the most frequent planned loss. It covers the filling change, the cutter or mould change and the first pieces until weight is right. Log it as a changeover, with a start and an end, against a standard time.

How to split cleaning time

  • The full end-of-week clean outside planned production time stays out of OEE. Report it separately.
  • The clean at an allergen change is part of the changeover. It is lost availability and shows in OEE.
  • An unplanned clean after spilled filling or stuck dough is a stop with a reason.

Regulation (EC) No 852/2004 requires cleaning and, where needed, disinfection at a frequency that avoids any risk of contamination. Risk sets the frequency, not the convenience of the schedule. So the cleans stay, but the filling sequence cuts their number.

SMED for a depositor or cutter change

The SMED method for quick changeovers splits the work into internal steps (the line is stopped) and external steps (the line runs). On a banitsa line the steps look like this:

  1. Film one changeover from last good piece to first good piece. Write down every step with its minutes.
  2. Move work outside the stop: preparing the next filling, the second hopper and the tools happen while the line still runs.
  3. Keep a second set of hopper and nozzles for the depositor, clean and ready. The change becomes a swap, not washing in place.
  4. Mark the settings of the cutter and curling unit per product, so there is no trial and error.
  5. Set a standard time and compare every changeover with it, every shift.

The quickest win usually sits in the first pieces. If weight is being adjusted for 10 minutes after start-up, those minutes are both scrap and speed loss. A written setting standard per product shortens them. The same logic applies at packing: film changes on a flow wrapper OEE and format changes on a case packer OEE.

Which way to measure

There are four realistic ways to measure OEE on this kind of line. They differ in how clearly you see stops and how much time the reporting costs. The costs below are estimates derived from people's time; software and integration are quoted.

OptionCost (estimate)What it givesWho it suits
Paper shift sheet0 EUR licence; about 15 min a shift, so 11 hours a month at 44 shiftsThe big stops and scrap; micro-stops vanishOne line, the first two weeks, testing the reasons
Spreadsheet0 EUR licence; the paper time plus 4-8 hours a month for entry and checksTrends by shift and product; numbers arrive late1-3 lines with someone who owns the data
PLC counts onlyAutomation engineer or integrator hours, quotedExact counts and run time; no stop reasonsLines with modern PLCs on the sheeter, freezer and packer
OEE and light MES with camera counts at make-upSubscription quoted per plant, by machines and modulesLive OEE by shift, reasons, changeovers, scrap by productSeveral lines, export, many fillings and changeovers

The sum for paper: 11 hours a month at 12 EUR an hour, Bulgaria's average hourly labour cost in 2025 according to Eurostat, is 132 EUR a month. Paper is not free. It is cheap, but it loses the short stops, and a banitsa line has plenty of them.

Who should pick which

  • Starting from zero: paper for two weeks on the busiest line. The aim is to learn the reasons, not to get an exact OEE.
  • Data exists but arrives late: a spreadsheet, if there are one to three lines and someone keeps it every day.
  • PLCs everywhere: the counters give exact counts, but without reasons the loss map stays empty.
  • Several lines and many fillings: a system with operator reasons and a camera where make-up has no signal. Prices are on the pricing page.

Questions for a vendor

  1. How is output counted on a make-up line that has no machine signal?
  2. Can the ideal rate be set per product when the freezer sets the pace?
  3. How are changeovers logged against a standard time?
  4. How are planned cleans kept apart from unplanned stops?
  5. How is scrap logged in kg by product and reason, including trim fed back?
  6. What happens to the data if the plant network drops?
  7. How are losses priced in money, and how is the price set for new lines?

If you need market data to justify the spend to the owner, Bulgaria's NSI publishes production of industrial products in volume and value under Industrial products in kind. According to Eurostat's metadata, the Bulgarian PRODCOM.BG list is identical to the EU list, and the survey covers 90% of sold production by value.

How to start

The first two weeks need nothing new except discipline. Here is the procedure as a card you can pin up next to the line.

6-step card for OEE on a frozen pastry line: pace, rate, counting, reasons, changeovers, scrap
Six steps from the first shift to the first decision on a banitsa, filo, puff pastry or croissant line.
Text version of the diagram
  1. Pick the pacing station: the freezer or the make-up line. That is where the line's ideal rate sits.
  2. Set an ideal rate per product: belt capacity divided by freezing time, in pieces per minute.
  3. Count at two points: after make-up and after packing. Use a camera where there is no signal.
  4. A reason for every stop: sheet break, depositor, freezer, waiting for dough, changeover, cleaning.
  5. Changeovers against a standard: fillings in order, gluten only, cheese, spinach, nuts last.
  6. Scrap in kg by product and reason: trim, misshapen, underweight. Review it weekly in money.

After two weeks, rank the reasons by minutes and by EUR. The first project is the biggest loss on the product with the most hours. On most banitsa lines that is the changeover, but the data decides, not habit.

If the plant also makes biscuits or other baked goods, the pacing logic is the same, only there the oven sets the pace. There is a comparison in the guide to OEE for biscuit production lines.

A case from the research literature shows the approach works on croissants. Tsarouhas (2019) analysed 15 months of failure data from a croissant line running 24 hours a day in three 8-hour shifts. Through availability, performance and quality, the author found the line's main problems and proposed TPM for its critical points.

Where Fabrico fits

Fabrico is an OEE platform and light MES. On a linked line like this one, it shows live OEE by line and shift, read at the core machine, here usually the freezer.

Machines connect through the line PLC or a Fabrico IoT device, and where a camera covers the make-up line it counts output. Operators choose stop reasons in a few taps.

Changeovers are tracked against a standard time, and scrap is recorded by product and reason. The Financial impact module prices losses in money per SKU and ranks stops by value. The minute of a stop opens from the shift timeline and is streamed on request, not stored. More on OEE and light MES.

Sources

All sources accessed 26.11.2026.

  • Council Directive 89/108/EEC on quick-frozen foodstuffs, EUR-Lex, CELEX 31989L0108.
  • Commission Regulation (EC) No 37/2005 on temperature monitoring of quick-frozen foodstuffs, EUR-Lex.
  • Regulation (EU) No 1169/2011, Annex II, EUR-Lex.
  • Regulation (EC) No 852/2004 on the hygiene of foodstuffs, EUR-Lex.
  • Codex Alimentarius, CXC 8-1976, GEQFF page and proposed draft revision, FAO.
  • NSI Bulgaria, Industrial products in kind; Eurostat, PRODCOM metadata for Bulgaria.
  • Eurostat, hourly labour costs 2025 (news release 31.03.2026).
  • Ban et al., LWT 73 (2016) 219-225, doi 10.1016/j.lwt.2016.05.045.
  • Akbarian et al., Journal of Food Science and Technology 53 (2016) 3761-3769, doi 10.1007/s13197-016-2361-2.
  • Tsarouhas, International Journal of Productivity and Performance Management 68 (2019) 88-108, doi 10.1108/IJPPM-02-2018-0060.

Frequently asked questions

Where should good output be counted on a frozen pastry line?

After packing, because that is where the finished pack exists. Add a second counter after make-up to see exactly where pieces go missing between the two points.

Does an allergen changeover clean count in OEE?

Yes, as part of the changeover, because the line was planned to run. The full end-of-week clean outside planned production time is reported separately.

How is trim fed back into the dough counted?

As a quality loss, in kg by product. It is not a good pack first time, even if it never reaches the bin.

What is a good OEE for a banitsa line?

There is no published industry benchmark for banitsa lines to stand on. Compare the line with itself, by product and shift, and check that the biggest loss keeps shrinking.

Can a camera count banitsa after the depositor?

Yes, a camera over the belt counts pieces where the depositor and cutter have no usable signal. The stop reason is still the operator's choice.

Should freezer temperature feed into OEE?

No. Temperature records are for safety. A deviation puts the batch on hold, and the packs count against quality only if they go to scrap or rework.

See OEE on a pastry line live. The demo shows OEE by line and shift, stop reasons in a few taps, changeovers against a standard time and scrap by product and reason.

Book a demo

Track OEE and downtime in real time
See where lines lose time