Computer Vision vs PLC vs Automated Optical Inspection Systems for OEE

Computer Vision vs PLC vs Automated Optical Inspection Systems for OEE

Computer vision, PLC signals and an automated optical inspection system measure different things. Which one resolves each OEE question on your line.
Computer Vision vs PLC vs Automated Optical Inspection Systems for OEE

A PLC signal, a camera and an automated optical inspection (AOI) system each answer a different OEE question. The machine signal, from a PLC, an IoT device or a plain counter, times stops and counts cycles wherever a usable signal exists. A camera counts output where none exists, such as a hand-assembly bench. An AOI system judges each part against a spec, and its reject count can feed the quality factor.

The rule of thumb: take stop times and cycle counts from the machine wherever it can give them, add a camera only where it cannot, and take the quality factor from whatever already judges the part. The worked example below prices what each source alone would miss.

Key Takeaways

  • Stops and cycles: the machine signal. A PLC, IoT device or counter times stops and counts cycles; a person gives the reason.

  • No signal: a camera add-on. A camera counts output at a manual bench or old machine, given a steady view (see camera placement and lighting) and a reference count.

  • Part quality: an AOI system. Its reject count feeds the quality factor, with false rejects kept apart.

  • Price the gap first. In the worked example, a camera add-on count at a manual bench explained 29 stop minutes worth EUR 696 a shift.

Three Data Sources, Three Different OEE Questions

OEE multiplies three factors: availability (the share of planned time a machine ran), performance (output against the ideal rate while running) and quality. Quality has a strict meaning: a NIST-hosted analysis of the ISO 22400 KPIs (Kang, Zhao, Li and Horst, International Journal of Production Research, 2016) defines good quantity as "The produced quantity that meets quality requirements in the first time of an operation process." Each factor needs different data.

Three sources cover them, each with its own reach:

  • Machine signal. A PLC, an IoT device or a counter times stops and micro-stops and counts cycles: availability and performance wherever a usable signal exists. Some machines also report their own rejects.
  • Camera add-on. A camera counts output where a station has no usable signal, such as a hand-assembly bench.
  • Automated optical inspection. An AOI system judges each part against a spec. Its reject count can feed quality; it does not time stops.

Performance can come from either of the first two, depending on the station; quality from the machine itself or from an AOI system.

The diagram shows the split.

Which data source feeds which OEE factorThree sources on the left, three OEE factors on the right. The machine signal from a PLC, IoT device or counter feeds availability and performance, and quality only if the machine counts its own rejects. A camera add-on feeds performance at stations with no usable signal. An automated optical inspection system feeds quality.Which source feeds which OEE factorMachine signalPLC, IoT, counterCamera add-onwhere no signalAOI systempart against specAvailabilitystop timePerformancecount vs idealQualitygood first timeDashed: only if the machine countsits own rejects.
Which data source feeds which OEE factor. The dashed line applies only where a machine reports its own reject count.

Fabrico, OEE software and light MES in one, works with the first two. It times stops and micro-stops from the machine signal, the operator picks the reason from a short list, and a camera add-on counts output at stations with no usable signal. Its financial impact module prices each loss from SKU price and margin and ranks stops by money.

A camera add-on earns its place at a hand-assembly bench, where nothing counts the output until someone tallies it. This explainer shows how it works.

Explainer presented by Iris, Fabrico's AI-generated presenter: how an add-on camera counts output where a machine has no signal. Book a demo.
Plays from YouTube. Google may set cookies when you press play. Privacy policy.

What a Machine Signal Answers, and Where It Runs Out

A usable signal tells a machine making parts from a machine that is merely on: a cycle pulse, a part counter or a PLC cycle count gives run time and output from one source. A power-draw signal is weaker. In a University of Sheffield AMRC project retrofitting low-cost sensors to legacy machine tools, a machine counted as running "If the current drawn by the machine was above a calibrated limit", and the authors note that "the machine running doesn’t fully indicate whether the machine is manufacturing a component or simply running in air." Ask for a count, not only a run state.

Short stops are not a blind spot of the signal. If the cycle signal pauses for eight seconds, the machine stopped for eight seconds; whether a report shows it depends on settings such as an input filter time or a minimum stop length. Keep them the same across machines, or their OEE cannot be compared.

A machine built to the PackML state model can report its own counts: the OPC UA companion specification for PackML (OPC 30050) says "The number of products processed minus the defective count is the number of non-defective products made by the machine." Where a machine reports that, quality can come from the signal too.

The signal runs out in three places: a station with no machine (hand assembly, kitting, packing), an old machine with no usable output, and the reason for a stop, which a person gives. See PLC tag mapping for OEE for the wiring, and OEE on legacy machines without PLCs for machines that give nothing.

What a Camera Add-On Answers, and Its Limits

Where a station has no usable signal, Fabrico's camera add-on counts its output, so performance shows there too. Counting is easy where parts arrive one at a time and hard where people work: a peer-reviewed study of camera counting at manual assembly stations (Pierleoni, Belli, Palma and Sabbatini, Journal of Imaging, 2020) notes that "In contexts where products are moved by conveyor belts, counting through a MV system might be trivial", unlike a bench where pieces pass between operators.

The limits show in numbers. The improved counter counted only "when there are no hands in the framed area". In a responsiveness test, 2% of pieces were not counted at all, all from two operators placing and picking at the same moment. The authors are frank: "The solution is not yet absolutely reliable, as it commits some errors". Three set-up rules follow:

  1. Steady light. Before the study plant fitted a diffuse light ring, "The variance due to environmental shadows and natural lighting influences on the illumination of the framed table is evident". Keep windows and moving shadows out of the view.

  2. One handover point. Count where finished parts are put down, on a tray, table or conveyor, not in the middle of the work. The authors note that the company must "train their staff to avoid simultaneous interactions on the table".

  3. A reference count. Compare the camera's count with a hand count or a shipping list over a set of shifts before it goes into OEE, and again after a product or lighting change. More in how accurate camera OEE is.

A camera helps after a stop too. Where a camera add-on covers the station, the video for the minute of a stop can be opened from the shift timeline, streamed on request and not stored in Fabrico; it shows what was in the frame, not the cause. On Fabrico's roadmap, not live today: the camera add-on detecting stops by itself, jam zones, and the camera add-on suggesting a likely reason. See the computer vision camera add-on and computer vision for OEE.

What an AOI System Answers, and What Its Reject Count Means

An automated optical inspection system has a different job: at one station, with controlled optics and lighting, it returns a pass or a fail for each part against a spec. For OEE it supplies one number, the reject count. Fabrico makes no inspection system and runs none.

Check two things before that count goes into OEE. First, a reject is a decision with an error rate. The VDI/VDE/VDMA 2632 Part 3 guideline on acceptance tests of classifying machine vision systems notes that for such systems "so far no corresponding established parameters exist", and it "suggests procedures for assessing classificatory performance during the acceptance process". Ask how false rejects and missed defects were measured when your system was accepted.

Second, a reject that a re-check finds good was still not good the first time. Under the ISO 22400 definition above it stays out of the good count; it ships later, at the crew cost of the re-check. Keep true and false rejects apart per shift (a scrap reason code taxonomy helps); the same data gives first pass yield.

Decision Matrix: Which Source Answers Which OEE Question

Read across a row: High, Moderate and None rate each source's fit for the question at a typical station, not a measured accuracy.

OEE question Machine signal (PLC, IoT device, counter) Camera add-on AOI system
What happened in the stop minute? When it stopped, plus a fault code if the controller sends one Moderate Not its job
How long did it stop, short stops included? High, wherever a usable signal exists On Fabrico's roadmap, not live today Not its job
How many did an old machine with no usable signal make? Only after a retrofit sensor or counter Yes, it counts there Only the parts that pass through it
How many did a hand-assembly bench make? Not its job Yes, it counts there Not its job
How many were good the first time? Moderate, if the machine counts its own rejects Not its job High: a pass or fail for each part
Effort to connect Moderate Lower: a mount, power, network and a clear view Higher: optics, lighting and a program for each product
What can it not see?Stations with no machine, and the reason for a stopAnything outside the frame or under a handStops, speed, and any fault it is not programmed to judge

Ratings are a planning guide, not test results; a camera rates High for counting only with a steady view, as the study above shows. Whatever the source, the reason for a stop comes from a person.

To see stops from a machine signal next to a camera add-on count on one shift timeline, book a demo on sample data.

Worked Example: A Socket-Outlet Line Measured Three Ways

All inputs are examples, not customer data. A wiring-device plant assembles a double socket outlet on three stations:

  1. Insert bench (manual). Three operators pre-assemble terminal inserts into trays of 50, about 11 inserts a minute each. With three at the bench, supply stays ahead of the machine's 30 a minute; with two, it falls 8 a minute behind. No signal.
  2. Assembly machine. Fits inserts into housings, drives screws and prints the face. Ideal rate 30 sockets a minute; its PLC gives a run state and a cycle count.
  3. AOI station. At the machine exit it checks screws, terminals and print and pushes rejects into a bin, keeping its own count.

One shift has 450 planned minutes. The machine signal timed 63 stop minutes: a 22-minute changeover, 29 minutes waiting for inserts and 12 minutes of screw-feeder jams. In 387 running minutes the machine counted 11,130 sockets against an ideal 11,610 (387 x 30): 480 sockets, or 16 minutes, of slow running. The AOI system rejected 210; a bench operator re-checked them at about 30 seconds each and found 60 good and 150 scrap.

The same shift, measured three ways:

ViewAvailabilityPerformanceQualityOEEWhat it misses
Machine signal only86.0%95.9%Shows 100% (no reject data)82.4%210 rejects, and why the machine waited
Plus the AOI reject count86.0%95.9%98.1%80.9%Why the machine waited
Plus a camera add-on count at the insert bench86.0%95.9%98.1%80.9%Nothing here: the bench count explains the 29 minutes

Availability is 387 / 450 = 86.0%, performance 11,130 / 11,610 = 95.9%, quality 10,920 good first time / 11,130 = 98.1%. OEE = 86.0% x 95.9% x 98.1% = 80.9%, which matches 364 good minutes (10,920 / 30) of 450. Without the AOI count, quality defaults to 100% and OEE reads 82.4%, 1.5 points high. The 60 false rejects stay out of the good count even though they ship later.

The camera add-on changes no OEE factor here, since the machine sets the pace; it changes the explanation. The operator logged "waiting for inserts", which says where to look, not why. The camera add-on's tray count shows the bench falling from about 40 trays an hour to about 26 while one operator re-checked the reject bin: 210 re-checks at 30 seconds took that operator off the bench for 105 minutes, and 8 inserts a minute short over 105 minutes is 840 inserts, or 28 machine minutes, close to the 29 it waited. False rejects pulled a person off the bench, and the bench starved the machine.

Now the money. Take an example ex-works price of EUR 4.00 a socket and a 20% margin, EUR 0.80. That sits inside the Electrical Equipment band of the NYU Stern margin table (112 US firms, "Data used is as of January 2026"): 9.53% pre-tax operating margin to 31.82% gross margin. Use the plant's SKU margin if it has one. Lost output is priced at margin only while orders wait for it; otherwise the cost is crew time.

LossMinutesSocketsWhich source shows itEUR a shift, orders waiting
Waiting for inserts29870Signal times it; camera add-on count explains it696.00
Changeover22660Signal and operator reason528.00
Slow running16480Signal count against the ideal rate384.00
Screw-feeder jams12360Signal and operator reason288.00
Scrapped rejects5150AOI count only120.00
Lost output842,5202,016.00
False rejects (ship later)260AOI count and the re-checkCrew time, 70.53
Example: one shift of losses on a socket-outlet line, pricedExample figures. Waiting for inserts 29 minutes, EUR 696, explained only with the camera add-on count at the insert bench. Changeover 22 minutes, EUR 528. Slow running 16 minutes, EUR 384. Screw-feeder jams 12 minutes, EUR 288. Scrapped rejects 5 minutes, EUR 120, seen only in the AOI reject count. False rejects 2 minutes, priced at crew time, EUR 70.53. Lost output 84 minutes, EUR 2,016 a shift while orders wait.Example: one shift of losses, pricedEUR 0.80 a socket, orders waitingWaiting for inserts, 29 minEUR 696Changeover, 22 minEUR 528Slow running, 16 minEUR 384Screw-feeder jams, 12 minEUR 288Scrapped rejects, 5 minEUR 120False rejects, 2 mincrew time EUR 70.53Lost output: 84 min, EUR 2,016 a shiftSignal plus the operator's reasonExplained only with the camera add-onSeen only in the AOI reject count
Example line, one shift: each loss in minutes and in EUR at a margin of EUR 0.80 a socket while orders wait. Example plant; check each station before buying.

Per month, at 42 shifts (two a day, 21 working days), the starved minutes alone are EUR 29,232 (696 x 42) and all lost output EUR 84,672 (2,016 x 42), only while orders wait. The re-check takes 105 operator minutes a shift: 1.75 hours at EUR 40.3, the 2025 euro-area industry labour cost from Eurostat ("industry being the highest paying sector (€40.3 per hour)"), or EUR 70.53. If orders are not waiting, the 84 lost minutes cost crew time instead: four people for 1.4 hours, EUR 225.68 a shift (4 x 1.4 x 40.3).

Alone, the machine signal priced EUR 1,896 of the EUR 2,016 and carried the operator's reasons, but could not say why the machine waited. The AOI count added EUR 120 of scrap and the 60 false rejects. The bench count turned the largest block, EUR 696, from a reason into a cause, and the fix costs little: move the re-check off the bench and ask the AOI supplier to review the reject limits that bin good sockets.

Choosing a Source: Options, Effort and Who Picks

Pick by the loss each option explains, not by the technology.

OptionChoose it ifEffortWho picks
Machine signal onlyEvery pace-setting station is a machine with a usable countA controls window, or a retrofit sensor or counterControls or automation engineer
Signal plus a camera add-onA manual or unsignalled station sets the pace or starves a machine, or a cell has no machines at allA mount, power, network, a steady view and a reference countProduction or CI manager
Add the AOI reject countAn AOI system already judges parts on the lineReading its count per shift; splitting true and false rejectsQuality manager

The order, from the worked example. Start with the machine signal wherever it exists; add a camera add-on only where a priced loss sits at an unsignalled station (the example's EUR 696); add the AOI count when quality is the gap (the example's 1.5 points).

The public cost figures here are for retrofits: in the AMRC project, "Two levels of target system cost were identified, one below £500 and one below £5,000." The plant manager picks which line goes first, by the money in the shift sum.

A camera at a manual station puts people in the frame, so involve HR, the data protection officer and any works council before the first mount. The European Data Protection Board’s guidelines on video devices note that "an employee in his/her workplace is in most cases not likely expecting to be monitored by his or her employer". Agree in writing what the camera add-on counts and who may open the video for the minute of a stop; in Fabrico it is streamed on request and not stored.

Questions to ask vendors

  • Machine signal: do you read a run state, a cycle count or PackML states and counts, and what filter time or minimum stop length applies?
  • Camera add-on: where exactly will it count, what happens when hands are in the frame, how is it checked against a reference count, and is any video stored?
  • AOI system: how were false rejects and missed defects measured at acceptance, and can rejects be split into true and false per shift?
  • Any OEE tool: does each number show its source, and are losses priced by SKU margin?

Frequently asked questions

Is PLC data or computer vision more accurate for OEE?

Neither is better in general; they answer different questions. The machine signal is the reference for stop times and cycle counts wherever a usable signal exists; a camera counts output where none exists, within the limits of its view. Check either against a hand count before you trust it.

When is PLC integration the better choice?

When the equipment already exposes the signals you need, when cycle counts are reliable at the controller, and when the environment makes a stable camera view difficult. It is also the lower ongoing maintenance option once wired.

When is a camera the better choice?

At hand-assembly and mixed stations, and on older equipment with no usable signal, where a camera can count output that nothing else counts. It does not find causes: the video for the minute of a stop helps a person see what happened, and the operator picks the reason. It is also quick to trial, because it does not touch the controls.

Can you run both on the same line?

Yes, and it is the common end state. The controller drives availability where it is reliable, and vision fills the unwired or manual sections so the OEE figure covers the whole line instead of the automated part of it.

Which is faster to deploy?

It depends on the station. A camera needs no controls change window or PLC programmer, a retrofit sensor on an old machine is a small electrical job, and a machine that already exposes its counts can be quickest of all. Pick the quickest route per station, not one route for the plant.

Does an AOI reject count belong in OEE?

Yes, in the quality factor. Count as good only the parts that were good the first time, so a false reject that a re-check passes still lowers quality. Keep true and false rejects apart: the first are lost output, the second cost crew time.

What to Do This Quarter

Seven steps a plant, production or CI manager can start this week, at the plant's own pace:

  • 1. Map the stations. For each station on one line, note what it has: a usable count, a run state only or nothing, and whether an AOI system judges parts there.
  • 2. Find the station that sets the pace. Watch where work waits: the station with a queue in front and idle stations after it sets the output.
  • 3. Price one shift. Time and count one shift, by hand if needed, and price the lost minutes at your SKU margin while orders wait.
  • 4. Connect the machine signal first wherever a usable one exists, and write down its filter time and minimum stop length.
  • 5. Add a camera add-on only where the shift sum points, agree it with HR and the works council, and set up a reference count (the computer vision OEE pilot guide sets the test).
  • 6. Ask quality for the AOI reject count per shift, split into true and false rejects.
  • 7. Compare the three views after a set of shifts and pick the next station by money.

Want stops timed from the machine signal and output counted by a camera add-on, on one OEE timeline? Book a demo to see it on sample data.

Request a demo
Track OEE and downtime in real time
See where lines lose time
Book a live demo.
See where lines lose time
See where lines lose time

Real Fabrico tiles, sample data.

By clicking the Accept button, you are giving your consent to the use of cookies when accessing this website and utilizing our services. To learn more about how cookies are used and managed, please refer to our Privacy Policy and Cookies Declaration