Key takeaways
- Idle time is paid or planned production time in which people or machines are ready to work but produce nothing, because they are waiting.
- Cost accounting splits labour idle time into normal idle time (unavoidable, such as paid breaks and machine start-up; absorbed into product cost) and abnormal idle time (avoidable, such as waiting for material; written off to costing profit and loss).
- In OEE, machine idle time (starved, blocked, waiting) inside planned production time is an availability loss. A breakdown is downtime, not idle time.
- Formula: labour idle time = hours paid minus hours booked to production; machine idle time = planned production time minus run time, downtime and setup.
- Sample edgebanding line: 57 idle minutes a shift put EUR 883.69 of margin at stake, EUR 668,071 a year, if the doors would sell, while the cost books write off EUR 124.93 a shift of abnormal idle wages.
Idle time is time that is paid for or planned for production in which people or machines are ready to work but produce nothing, because they are waiting. In cost accounting it is labour idle time: the difference between the hours paid and the hours spent on production, split into normal idle time (unavoidable, such as paid breaks or starting a machine at the start of a shift) and abnormal idle time (avoidable, such as waiting for material, a breakdown or a lack of orders). On the shop floor, machine idle time is time a machine is able to run but does not, because it is starved, blocked, or waiting for an operator or material.
To calculate it, take hours paid minus hours booked to production for labour, and planned production time minus run time, downtime and setup for a machine. Idle time is not the same as equipment downtime: when a machine breaks down, the machine is down while the crew standing beside it is idle. One event lands in two ledgers, and this guide reconciles them on a worked example priced in euros.
The cost accountant asks who pays for the waiting. The production manager asks what it cost in output, through availability, one of the three factors of OEE. Both are right, and they price the same minutes differently.
Idle machines also draw power while they wait; that side of the topic has its own page on standby and idle energy losses.
Idle Time Meaning: Labour Idle Time and Machine Idle Time
The term comes from cost accounting. The cost accounting course of Jagat Guru Nanak Dev Punjab State Open University defines idle time as the difference between the time paid for and the time actually spent on production, and divides it into normal idle time, due to unavoidable factors, and abnormal idle time, caused by avoidable factors. It is a labour measure: the worker is at the plant and paid, and no product is being made.
Machine idle time is the same idea seen from the machine. A machine is idle when it is able to run and no fault has stopped it, but it is not producing. In a serial line two of the reasons have names. A 2023 study of bottlenecks in serial manufacturing systems from TU Dortmund defines them: a station is blocked if the downstream buffer is filled to the maximum, and starved if the upstream buffer is empty and cannot supply another part. Add waiting for an operator or material, and no orders, and you have the four kinds of machine idle time this guide uses.
Machine data standards draw the same line. The OPC UA for Machinery specification, Annex C interprets a machine that is not executing while in processing mode as the SEMI E10 state "standby time", separate from unscheduled downtime and from productive time. That is idle time in standards language: the machine is available and waiting. It is not unplanned downtime, where the machine cannot run.
Both ledgers start from the same record: which minutes the machine ran, which it waited, and why. OEE software takes run time and counts from the machine's PLC or from an IoT device with sensors on the machines you connect, and operators give the reason for a stop at the machine, so starved, blocked, waiting and breakdown minutes add up by machine and shift. The video shows a sample shift timeline and how an operator gives a stop its reason.
What you see: a shift timeline, unclassified time waiting for a reason, and the operator's line-down screen, on sample lines. Book a demo.
Plays from YouTube. Google may set cookies when you press play. Privacy policy.
The Difference Between Downtime and Idle Time in Manufacturing
Idle time and downtime both take time out of a shift, but they have different causes, different owners and different fixes, so they are logged and reported apart. The test is one question: could the machine have run? If yes, the lost time is idle time. If no, it is downtime.
A breakdown shows why the two ledgers disagree. For the machine, the minutes are downtime. For the crew standing beside it, the same minutes are idle time, because they are paid and cannot work. Here is the difference in short:
- Idle time: the machine, or the person, is able to work and is not working. The machine waits for parts from upstream (starved), for space downstream (blocked), for an operator or material, or for an order. A paid break is idle time for the worker in cost accounting; in OEE it is a planned stop that sits outside planned production time.
- Downtime: the machine is not able to run, because of a breakdown, a fault or maintenance. Planned maintenance is a planned stop; a breakdown during planned production time is an availability loss. See planned vs unplanned downtime for the split.
Types of Idle Time: Normal and Abnormal Idle Time
Cost accounting sorts labour idle time into two types by one question: could the plant have avoided it? Normal idle time could not; abnormal idle time could. The split decides who pays for the minutes.
Normal Idle Time
Normal idle time is idle time the plant cannot avoid in the normal course of work. Labour costing study material from Umesh Chandra College lists the time taken by workers to get from the factory gate to the spot of production, the time between finishing one job and starting the next, and breaks allowed during working hours.
The time taken to start a machine is an example of normal idle time: every shift starts the machine, the crew is paid while it warms up and runs its first checked part, and no plan removes it altogether. A power cut is the abnormal case, because it is not part of a normal shift.
A packing machine waiting for the machine before it is starved idle time in the production ledger, whoever is to blame. In the cost ledger it is normal only if the plant's labour standard allows for it; if a missing pallet of material caused it, it is abnormal.
How it is costed: the PSOU course charges normal, uncontrollable idle time to jobs by inflating wage rates, so each productive hour carries a little more labour cost and nothing is written off.
The line between normal and abnormal is a plant decision written into the labour standard, for example a paid break and a start-up allowance per shift. Write it down, or each month's split becomes a debate.
Abnormal Idle Time
Abnormal idle time is idle time the plant could have avoided. The PSOU course groups its causes as production causes (machine breakdown, power failure, waiting for materials, tools or instructions), administrative causes (lack of planning or supervision) and economic causes (surplus manpower, inadequate demand, strikes).
A breakdown sits in both ledgers. For the crew beside the broken machine it is abnormal idle time; for the machine it is downtime, not idle time, because it cannot run. A power outage works the same way.
Idle machines have an accounting rule too. Under IAS 2 Inventories, as adopted in the EU, fixed production overhead is allocated on normal capacity, and the amount allocated to each unit is not increased as a consequence of low production or idle plant; the unallocated overhead is an expense of the period. Depreciation on an idle machine is not loaded onto the products the machine did make.
The same standard excludes abnormal amounts of wasted materials, labour or other production costs from the cost of inventories and recognises them as expenses when they occur. In the cost books the matching entry is the costing profit and loss account: abnormal idle wages are charged there, not to the product. The table puts the three kinds of lost time side by side.
| Normal idle time | Abnormal idle time | Downtime | |
|---|---|---|---|
| Definition | Paid or planned time lost to causes the plant cannot avoid in normal work | Paid or planned time lost to causes the plant could have avoided | Time the machine cannot run: a breakdown, a fault or maintenance |
| Example on a line | Paid break, starting the machine at the start of a shift, moving between jobs | Starved by a late upstream machine, blocked by a stopped downstream machine, waiting for material, no orders | A jammed trimming unit, a glue unit fault, a power cut |
| Who owns it | The production manager, who sets the allowance in the labour standard | Whoever owns the cause: planner, supervisor, logistics or maintenance | Maintenance, with the production manager |
| How it is costed | Wages absorbed into product cost, for example by inflating the wage rate per productive hour | Wages charged to costing profit and loss; abnormal amounts are an expense of the period under IAS 2 | The crew's waiting is abnormal idle time; the repair is a maintenance cost |
| Where it sits in OEE | The break is a planned stop, outside planned production time; start-up inside it is an availability loss | Inside planned production time, an availability loss; no orders sits outside it when the plan removes the hours | An availability loss when it happens inside planned production time |
How to Calculate Idle Time: Formula and Examples
There are two idle time formulas, one for each ledger, and they answer different questions:
Labour idle time = Hours paid minus Hours booked to production. Machine idle time = Planned production time minus Run time minus Downtime minus Setup time
The old shortcut, planned time minus actual production time, mixes idle time with downtime and setup. Subtract those first, or a breakdown shows up as idle time and the wrong team gets the action.
- Idle time for employees: an operator is paid for an 8-hour shift, and the job cards book 6 hours 50 minutes to production orders. Idle time is 8 hours minus 6 hours 50 minutes = 70 minutes: two paid 15-minute tea breaks (30 minutes of normal idle time) and 40 minutes waiting for a missing part (abnormal idle time). An unpaid lunch break is not idle time, because nobody is paid for it.
- Idle time for equipment: a machine is planned to run for 12 hours and runs for 3. The 9 hours are not all idle time. If 4 hours went to a breakdown and 1 hour to a changeover, machine idle time is 12 minus 3 minus 4 minus 1 = 4 hours, and those 4 hours need a reason: starved, blocked, waiting for an operator or material, or no orders. The breakdown hours belong to downtime.
Idle time example in money: one shift on an edgebanding line
Sample figures for illustration only. A plant makes melamine kitchen cabinet doors for kitchen makers. Its edgebanding line is the constraint: the panel saw before it has spare capacity, and the drilling machine after it is faster on average. The line runs 3 shifts a day on 21 working days a month, with a crew of 2: an operator at the infeed and a stacker at the outfeed. Each shift is 450 paid minutes (7.5 hours), including a paid 30-minute break.
Last month's stop log gives the average shift, with each kind of minute classified in both ledgers:
| What happened | Minutes a shift | Production ledger (OEE) | Labour ledger (cost accounting) | Crew wages (2 people) | Margin at stake |
|---|---|---|---|---|---|
| Paid break | 30 | Planned stop, outside planned production time | Normal idle time, absorbed | EUR 40.30 | None: planned |
| Start-up at the start of the shift | 15 | Setup, availability loss | Normal idle time, absorbed | EUR 20.15 | EUR 232.55 |
| Starved: no cut panels from the saw | 27 | Idle, availability loss | Abnormal idle time, written off | EUR 36.27 | EUR 418.59 |
| Blocked: drilling machine stopped, buffer full | 15 | Idle, availability loss | Abnormal idle time, written off | EUR 20.15 | EUR 232.55 |
| Waiting for an operator or material (edge band, glue) | 15 | Idle, availability loss | Abnormal idle time, written off | EUR 20.15 | EUR 232.55 |
| Breakdown: glue unit fault | 18 | Downtime, availability loss | Abnormal idle time, written off | EUR 24.18 | EUR 279.06 |
| No orders at the end of the shift | 18 | Not planned, outside planned production time | Abnormal idle time, written off | EUR 24.18 | None: nothing to make |
| Run | 312 | Run time | Productive | EUR 419.12 | Earned |
| Total | 450 | EUR 604.50 |
The production ledger. Planned production time is 450 minus the 30-minute break minus the 18 minutes with no orders = 402 minutes. Run time is 402 minus 15 minutes of start-up, 57 idle minutes (27 starved, 15 blocked, 15 waiting) and 18 minutes of downtime = 312 minutes. Availability = 312 ÷ 402 = 77.61%; in the ISO 22400 terms of the OPC UA annex, actual production time divided by planned busy time. The 57 idle minutes alone take 14.18 points of availability, more than the breakdown's 4.48.
The labour ledger. The crew costs 2 x EUR 40.3 an hour, the Eurostat 2025 hourly labour cost for industry in the euro area, EUR 604.50 for the 7.5-hour shift. Normal idle time is the break and the start-up: 45 minutes, or 1.5 crew hours, EUR 60.45. It stays in the product cost: spread over the 10.4 productive crew hours, it raises the labour cost per productive hour from EUR 40.30 to EUR 46.11. Abnormal idle time is the starved, blocked, waiting, breakdown and no-order minutes: 93 minutes, or 3.1 crew hours, EUR 124.93, charged to costing profit and loss.
The money. The line made 1,248 good doors in 312 run minutes, 4 good doors a run minute. Take a sample selling price of EUR 12.80 a door and the 30.28% gross margin NYU Stern reports for US furniture and home furnishings companies (27 firms, data as of January 2026). A door then carries EUR 12.80 x 30.28% = EUR 3.87584 of gross margin, and a run minute 4 x EUR 3.87584 = EUR 15.50336. The 57 idle minutes put EUR 883.69 of margin at stake a shift, the 18 minutes of downtime EUR 279.06 and the 15 minutes of start-up EUR 232.55, if the extra doors would sell.
Per month (63 shifts) and per year (12 x 63 = 756 shifts), the two ledgers give:
| Edgebanding line | A shift | A month (63 shifts) | A year (756 shifts) |
|---|---|---|---|
| Normal idle wages, absorbed into door cost | EUR 60.45 | EUR 3,808.35 | EUR 45,700.20 |
| Abnormal idle wages, charged to costing profit and loss | EUR 124.93 | EUR 7,870.59 | EUR 94,447.08 |
| Margin at stake in the 57 idle minutes | EUR 883.69 | EUR 55,673 | EUR 668,071 |
| Margin at stake in all 90 minutes of availability loss | EUR 1,395.30 | EUR 87,904 | EUR 1,054,849 |
Do not add the rows. Wages are paid whether the doors sell or not, so they are the cash cost of the waiting. The margin is the opportunity cost, and it is real only on a constraint machine whose extra output would sell. A sector figure from 27 US companies is a stand-in: put your own SKU margin in its place when you have it. The 57 idle minutes cost EUR 76.57 in wages and put EUR 883.69 of margin at stake: the wage figure, the one the cost books show, is the smaller by a factor of more than ten.
Fabrico does the same pricing from its own data: with the selling price and margin of each SKU entered, losses are priced in money, and idle and downtime minutes appear in euros side by side. The euros are a layer above OEE, which itself stays a production measure.
How to Reduce Idle Time in Production
Idle time falls when the constraint is never starved or blocked, nothing it needs is missing, and each idle minute is logged with a reason. Three levers follow.
- Find the constraint, then keep it fed and emptied
On a line with one clear constraint, idle time on another machine costs little output: that line could not have made more anyway. Idle time on the constraint is lost output. To find the constraint from data, a Chalmers University and Volvo Group Trucks study examines the average active period of each machine, the time when it is not waiting, from machine states and time stamps recorded by a manufacturing execution system (MES). The machine that waits least is the bottleneck. See bottleneck analysis for the methods.
Then read the constraint's idle minutes by reason. Starved time points upstream: the machine before it, the material supply or the order of work. Blocked time points downstream: the next machine has stopped or its buffer is full. The starvation and blocking pattern across the line shows where a buffer or better line balancing pays.
Fixes for starved time: cut or prepare parts in the constraint's order, keep a small buffer in front of it, and release no job whose material is not at the machine. Fixes for blocked time: a buffer or a trolley after the constraint, so that a short stop downstream does not stop it.
Breakdowns cause idle time on the machines around them: when the drilling machine stops, the edgebander is blocked. Count the breakdown once, as downtime on the machine that failed, and the blocked minutes as idle time on the constraint, so each number has one owner.
- Make sure nothing and nobody is missing
Waiting for an operator or material has the cheapest fixes: the next job's material, consumables and tools at the machine before the current job ends, such as edge band rolls and glue at the edgebander before the shift starts.
Train a second person on the constraint, so it does not wait while its operator fetches material. A skills matrix shows who can step in.
Agree who answers when the constraint calls for help, and how fast.
When the order book leaves part of a shift empty, move the crew to another machine, to packing or to training, so the wages buy work.
- Log idle time by reason, machine and shift
Idle time that is not logged ends up in neither ledger. Separate the reasons at the machine: starved, blocked, waiting for an operator, waiting for material and no orders, apart from breakdowns and setups, so that idle time and downtime never share a code. The machine states for OEE page lists the states and their place in the time model.
Then report idle minutes by reason for each machine and shift, next to availability. The availability loss vs performance loss guide explains where waits end up when they are too short to log: in Performance, as slow running.
Use the same reason codes in the labour idle time report, so both ledgers describe the same minutes.
Review the numbers weekly with the owners of the causes: the planner, the supervisor and maintenance.
To see idle time next to the other losses, see the six big losses of OEE.
Which idle time to attack first: starved, blocked, waiting or no orders
On the sample edgebanding line, four kinds of idle time compete for attention, and each returns a different amount for a different effort. Rank them by return before anyone spends money. Price them on the constraint only; on any other machine, idle minutes are a labour cost, not lost output.
| Option | Minutes won back a shift (example) | Yearly margin if the doors sell (756 shifts) | Effort, our estimate | Owner | Risk |
|---|---|---|---|---|---|
| A. Starved: cut panels in the edgebander's order and keep a buffer in front of it | 18 (27 to 9) | EUR 210,970 | 37 to 80 hours of planner and supervisor time (EUR 1,491 to 3,224), plus any buffer racks you buy | Production manager, with the planner | A buffer that hides a saw problem instead of fixing it |
| B. Blocked: a trolley buffer after the edgebander for drilling machine stops | 10 (15 to 5) | EUR 117,205 | 16 to 44 hours (EUR 645 to 1,773), plus trolleys and floor space | CI engineer | Buffers that grow until doors get damaged in handling |
| C. Waiting for an operator or material: edge band and glue at the line before each shift, a trained second person for the constraint | 9 (15 to 6) | EUR 105,485 | 6 to 12 hours to set the routine (EUR 242 to 484), then minutes a shift | Supervisor | Line-side stock in the wrong colours |
| D. No orders: move the crew to other work when the plan runs dry | 0 (no order to make) | None; it saves up to EUR 24.18 a shift of abnormal idle wages, EUR 18,280 a year | 4 to 8 hours of planner time (EUR 161 to 322) | Planner, with the production manager | Crew moved off the constraint just before a late order arrives |
Effort is our estimate for one line, in hours at the same EUR 40.3 as the example, and it leaves out software and anything you buy. The margin column applies the example's EUR 15.50336 per run minute and is real money only if the extra doors would sell. Options A, B and C together return 37 of the 57 idle minutes, EUR 433,660 a year at the example margin, without a new machine.
Who picks which. The production manager and the planner own A and D, in whichever ERP, APS or planning spreadsheet holds the plan. The CI engineer owns B, because buffers change the layout. The supervisor owns C. On the example line, C is the cheapest start and A returns the most.
Questions to answer before you choose:
- Which machine is the constraint by the active-period test, and is it the one with the idle minutes?
- How many idle minutes did the constraint have last week, split into starved, blocked, waiting and no orders, according to the log rather than memory?
- What is one run minute of the constraint worth in margin, and would the extra output sell?
- Where does the labour standard draw the line between normal and abnormal idle time, and does the accountant use the same reason codes?
- To an OEE software vendor: can operators give starved, blocked, waiting and no-order reasons at the machine, separate from breakdowns, and can the minutes be exported by machine and shift for the cost report?
Idle time actions by role: plant manager, production manager, CI engineer
Measuring idle time on one line takes a week of logs; cutting it takes a quarter. The table splits the work.
| Role | First week | First quarter |
|---|---|---|
| Plant manager | Ask for two figures per area: the constraint's idle minutes a shift by reason, and what one of its run minutes earns in margin. | Agree with finance where normal idle time ends, and review idle minutes in euros next to availability every month. |
| Production manager and planner | Check whether any shift ran out of orders last week, and how many crew hours that left idle. | Cut starved and no-order minutes on the constraint with job order, material release and crew moves in the planning tool. |
| CI engineer | Map starved and blocked minutes for each machine on one line to confirm the constraint. | Size buffers before and after the constraint, and record idle minutes before and after. |
This week, on one line:
- Name the constraint: the machine that waits least.
- Check that idle reasons (starved, blocked, waiting for an operator, waiting for material, no orders) are logged apart from breakdowns and setups.
- Add up last week's idle minutes on the constraint by reason.
- Split the crew's idle time into normal and abnormal with the plant's labour standard, and price both at the crew's hourly cost.
- Value a run minute of the constraint (good units per run minute x price x margin per unit), then scale it by the idle minutes of a shift, the shift count of a month, and for the year 12 times that monthly count.
- Bring the largest idle reason and its owner to the next production meeting.
How Fabrico Records Idle Time and Downtime
Fabrico works as OEE software and a light MES. Its run time, stop and count data come from the machine's PLC or an IoT device with sensors on the machines you connect, and operators give the reason for a stop at the machine, so starved, blocked, waiting, no-order and breakdown minutes are kept apart by machine and shift.
With the selling price and margin of each SKU entered, losses are priced in money, so the idle minutes on the constraint and the downtime next to them show up in euros, and analytics and reporting sorts them by reason, machine and shift for the weekly review.
Where a station has no usable machine signal, such as a manual packing bench, the computer vision camera add-on counts output. Where the camera add-on covers the station, the video for the minute of a stop can be opened from the shift timeline, streamed on request and not stored in Fabrico.
Maintenance is built in: a stop reason can be set up so that logging it opens a maintenance task for that machine. A recurring glue unit fault then reaches the people who fix it, while the idle minutes it causes on the machines around it stay with production.
Conclusion: Count Idle Time in Both Ledgers
Idle time is one set of minutes with two prices. The cost accountant splits it into normal and abnormal idle time and decides what goes into the product and what is written off. The production manager splits it into starved, blocked, waiting and no orders, and sees it in availability.
Use one log for both: idle reasons recorded at the machine, by machine and shift, apart from downtime. Then price the constraint's idle minutes at its margin a run minute, fix the largest reason first, and let the accountant's split come from the same minutes. For the time model beyond OEE, TEEP also counts the hours with no orders that OEE leaves out.
Frequently asked questions about idle time
What is the meaning of idle time?
Idle time is time that is paid for or planned for production in which people or machines are ready to work but produce nothing, because they are waiting. For labour it is the difference between the hours paid and the hours spent on production. For a machine it is time it could run but does not, because it is starved, blocked, waiting for an operator or material, or has no orders.
What does machine idle mean?
A machine is idle when it is able to run and is not producing, and no fault has stopped it. In a serial line it is starved when the buffer before it is empty and blocked when the buffer after it is full. In OEE, machine idle time inside planned production time is an availability loss.
What is normal idle time?
Normal idle time is idle time that cannot be avoided in normal work: paid breaks, getting from the factory gate to the machine, the gap between finishing one job and starting the next, and starting a machine at the start of a shift. Its wages are absorbed into the cost of production.
What is abnormal idle time?
Abnormal idle time comes from avoidable causes: a breakdown, a power failure, waiting for materials or instructions, poor planning, a lack of orders or a strike. Its wages are charged to the costing profit and loss account, not to the product.
Is the time taken to start a machine normal or abnormal idle time?
Normal idle time. Starting a machine at the beginning of a shift is part of every shift and cannot be avoided altogether, so its cost goes into the product cost. If start-up takes longer than the plant's standard allows, the excess is abnormal idle time. In OEE, start-up inside planned production time still lowers availability.
How do you calculate idle time?
For labour: idle time = hours paid minus hours booked to production. For a machine: idle time = planned production time minus run time minus downtime minus setup time. Example: a machine planned for 12 hours runs for 3, with 4 hours of breakdown and 1 hour of changeover, so its idle time is 4 hours.
What causes idle time?
Waiting: for material, for an upstream machine to deliver, for a downstream machine to take more, for an operator, or for orders. A breakdown causes idle time for the crew and the machines around it, while the broken machine itself is in downtime.
How is idle time different from downtime?
Downtime means the machine cannot run, because of a breakdown, a fault or maintenance. Idle time means it could run but is waiting. Keep them apart in the log: downtime goes to maintenance and reliability, idle time goes to planning, material supply and line balance.
Does idle time show up in OEE?
Yes, when it falls inside planned production time: starved, blocked and waiting minutes lower availability. Time with no orders that the plan removes from the schedule sits outside planned production time, so OEE does not show it, while TEEP, which uses all calendar time, does. Waits too short to log end up in Performance as slow running.
How do you reduce idle time?
Find the constraint first; idle time on other machines does not cost output. Then cut its largest idle reason: feed it in order and buffer it against starving, buffer it against downstream stops, stage material, cover its operator, and move the crew when the plan runs dry.
To see idle time, downtime and run time split by machine and shift on a sample line, book a demo.
Related articles
Latest from our blog

Real Fabrico tiles, sample data.